首页 | 官方网站   微博 | 高级检索  
     

二滩水电站电气主接线设计
引用本文:刘彦红. 二滩水电站电气主接线设计[J]. 水电站设计, 1998, 14(3): 88-91,83
作者姓名:刘彦红
作者单位:成都勘测设计研究院
摘    要:二滩水电站以500KV一级电压接入系统,出线4回。500KV侧为3/2和4/3接线,发电机与变压器单元接线。本文简要介绍了电站接入系统和电气主接线设计及其优化过程,以及开关站位置的选择。

关 键 词:一次系统 电气主接线 一次设备 水电站 优化

Electric Busbar Connection Design for Ertan Hydroelectric Plant
Liu Yihong. Electric Busbar Connection Design for Ertan Hydroelectric Plant[J]. Design of Hydroelectric Power Station, 1998, 14(3): 88-91,83
Authors:Liu Yihong
Affiliation:Liu Yihong
Abstract:The four circuit outgoing feeder of Ertan Hydroelectric Plant is connected into system by 500kV primary votage.At 500kV side are 3/2 and 4/3 connections,generator and transformer element connections.The paper briefly introduces plant connecting into system,electric busbar connection design and their optimized process,as well as switch station site selection.
Keywords:primary system  electrical main connection  primary equipment.
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号