摘    要:结合崖上村隧道施工工程概况,介绍了喷混凝土、锚杆、加设钢筋网、格栅钢架施作等各施工环节的施工技术,并对初期支护的施工工艺、技术参数等均做了详细阐述,以供同类工程参考.

关 键 词:隧道  复合式衬砌初期支护  钢筋网  锚杆
文章编号:1009-6825(2007)28-0324-02
修稿时间:2007-04-26

Construction of primary support of composite lining in Yashangcun tunnel
MA Wen-ping. Construction of primary support of composite lining in Yashangcun tunnel[J]. Shanxi Architecture, 2007, 33(28): 324-325
Authors:MA Wen-ping
Affiliation:MA Wen-ping
Abstract:Combined with general engineering condition of Yashangcun tunnel construction, the author introduces construction technologies of each construction link as shotcrete, anchor pile, adding reinforcement mat and construction of grid reinforcement, and illustrates construction technology and technical parameter of primary support, in order to offer a reference for similar engineering.
Keywords:tunnel   primary support of composite lining   reinforcement mat   anchor pile