公伯峡水电站发电厂房施工质量管理
引用本文:曹西高,董国庆,李先波.公伯峡水电站发电厂房施工质量管理[J].水力发电,2004,30(8):63-64.
作者姓名:曹西高  董国庆  李先波
作者单位:葛洲坝集团公司公伯峡施工项目部,青海,化隆,810902
摘    要:公伯峡水电站发电厂房工程的施工质量管理采用:强化质量意识,健全制度,落实质量责任,技术措施先行,资源投入到位,严格工艺作风,强化现场控制等措施;通过全体职工的努力,工程施工质量一直保持在较高的水平。

关 键 词:质量管理  发电厂房工程  公伯峡水电站
文章编号:0559-9342(2004)08-0063-02

Construction quality management of the powerhouse for Gongboxia Hydropower Station
Cao Xi gao,Dong Guo qing,Li Xian bo.Construction quality management of the powerhouse for Gongboxia Hydropower Station[J].Water Power,2004,30(8):63-64.
Authors:Cao Xi gao  Dong Guo qing  Li Xian bo
Abstract:The management of construction quality of the powerhouse of Gongboxia Hydropower Station adopted the following measures: strengthening the awareness of quality, perfecting the system, implementing the responsibility of quality, carrying out technical measures in advance, inputting enough resources, fulfilling strictly techniques, and increasing the field control. With the concerted effort of all the workers, the high quality of the project has been gained.
Keywords:quality management  powerhouse  Gongboxia Hydropower Station