首页 | 官方网站   微博 | 高级检索  
     


Construction and measurement of the pre-series twin aperture resistive quadrupole magnet for the LHC beam cleaning insertions
Authors:de Rijk   G. Bidon   S. Boter   E. Clark   G.S. Hans   O. Racine   M. Salinas   A.
Affiliation:CERN, Geneva;
Abstract:CERN's Large Hadron Collider (LHC) requires 48 twin aperture resistive quadrupoles in the beam cleaning insertions. Canada is contributing these magnets to CERN in the framework of the TRIUMF-LHC collaboration contracts. A pre-series magnet was produced by Canadian industry and delivered in March 2001. This magnet incorporates important design changes that resulted from experience with a prototype magnet. The construction of this pre-series magnet and the measurements made at ALSTOM and at CERN are reported. A comparison is made between high precision pole distance measurements and the magnetic measurements performed with a rotating coil mole. Conclusions for series production and possibilities for multipole corrections are outlined.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号