A new monitoring system for piping systems in fossil fired power plants
Authors:K Maile  H Purper  B Wilson  K Rohler  H Lehmann  J Garcia and J Fernandez
Affiliation:

Staatliche Materialprü fungsanstalt (MPA), University of, Stuttgart, Germany

Babcock Energy Ltd, Renfrew, United Kingdom

Deutsche Babcock Werke AG, Oberhausen, Germany

Rheinisch-Westfahscher TÜV, Essen, Germany

Empresarios Agrupados, Madrid, Spain

Union Fenosa, Madrid, Spain

Abstract:A CEC-funded project has been performed to tackle the problem of producing an advanced Life Monitoring System (LMS) which would calculate the creep and fatigue damage experienced by high temperature pipework components. Four areas were identified where existing Life Monitoring System technology could be improved:
1. 1. the inclusion of creep relaxation
2. 2. the inclusion of external loads on components
3. 3. a more accurate method of calculating thermal stresses due to temperature transients
4. 4. the inclusion of high cycle fatigue terms.

The creep relaxation problem was solved using stress reduction factors in an analytical in-elastic stress calculation. The stress reduction factors were produced for a number of common geometries and materials by means of non-linear finite element analysis. External loads were catered for by producing influence coefficients from in-elastic analysis of the particular piping system and using them to calculate bending moments at critical positions on the pipework from load and displacement measurements made at the convenient points at the pipework. The thermal stress problem was solved by producing a completely new solution based on Green's Function and Fast Fourier transforms. This allowed the thermal stress in a complex component to be calculated from simple non-intrusive thermocouple measurements made on the outside of the component. The high-cycle fatigue problem was dealt with precalculating the fatigue damage associated with standard transients and adding this damage to cumulative total when a transient occurred.

The site testing provided good practical experience and showed up problems which would not otherwise have been detected.

Keywords:Life assessment and monitoring  creep damage  fatigue damage  thermal stresses  external loads  power plants