首页 | 官方网站   微博 | 高级检索  
     

某集装箱码头强夯处理有限元分析
引用本文:李沫. 某集装箱码头强夯处理有限元分析[J]. 山西建筑, 2009, 35(16): 125-126
作者姓名:李沫
作者单位:新疆昌吉州第二工程处,新疆,昌吉,831100
摘    要:根据某集装箱码头勘测资料,采用拟静力方法,建立三维有限元模型。分析了强夯处理下地基位移和孔隙水压力的变化规律,得出了夯坑沉降量与夯击数之间的关系,经与现场实测结果对比表明数值模拟效果较好,数值模拟能够反映强夯施工中的各种现象,可为强夯施工设计服务。

关 键 词:拟静力法  强夯  位移  孔隙水压力  三维有限元分析

Finite element analysis of dynamic compaction in foundation treatment of a container terminal wharf
LI Mo. Finite element analysis of dynamic compaction in foundation treatment of a container terminal wharf[J]. Shanxi Architecture, 2009, 35(16): 125-126
Authors:LI Mo
Abstract:Three-dimensional finite element analysis model was built by the quasi-static force method on the basis of reconnaissance data of a container terminal wharf.The ground was consolidated by dynamic compaction method,the variety rules between the number of tamping passes and the crater settlement were confirmed by analysis of ground deformation and pore pressure.The numerical simulation results of dynamic compaction show that the simulation results are in accord with the field test results on the whole,the num...
Keywords:the quasi-static force method  dynamic compaction  deformation  pore pressure  three-dimensional finite element analysis  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号