首页 | 官方网站   微博 | 高级检索  
     

带有优先约束的分批排序问题
引用本文:陈丽珍. 带有优先约束的分批排序问题[J]. 枣庄师专学报, 2009, 26(5): 64-67
作者姓名:陈丽珍
作者单位:山东农业大学,信息科学与工程学院,山东,泰安,271018 
摘    要:对工件带有优先约束的分批排序问题进行了研究,其目标函数为最大完工时间.优先约束为:有一个树上包含有n个工件,其余的m-1条链上的工件数总和为常数,且工件的加工时间不限制.对于此种情况,给出了一个多项式时间算法.

关 键 词:排序  批处理机  优先约束  算法复杂性

A Batching Schedule Problem with Chain Precedence Constraints
CHEN Lizhen. A Batching Schedule Problem with Chain Precedence Constraints[J]. Journal of Zaozhuang Teachers' College, 2009, 26(5): 64-67
Authors:CHEN Lizhen
Affiliation:CHEN Lizhen ( Shandong Agricultural University, College of Information Science and Engineerning, Tai an 271018,China)
Abstract:The problem of scheduling jobs with chain precedence constraints is considered. The target func- tion is minimizing the makespan. Precedence constraints are a tree, where n jobs in one tree, a constant number of jobs in the other m - 1 chains. And presents a polynomial algorithm for this case.
Keywords:schedule  batching machine  Precedence constraints  the complexity of algorithm
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号