首页 | 官方网站   微博 | 高级检索  
     


Environmental factors causing pipe cracks and degradation in primary system components—KWU steam generator experience
Authors:G Schücktanz  R Riess  L Stieding
Affiliation:

Kraftwerk Union AG (KWU), D-8520, Erlangen, Postfach 3220, Frauenauracher Strasse 85, Federal Republic of Germany

Abstract:The tubes in steam generators of nuclear power plants with pressurised water reactors form the link between the active primary circuit and the secondary steam water circuit. The integrity of the tubes is therefore a mandatory requirement for a safe operation. This can be met by a careful design of the steam generators as well as the whole secondary circuit by an appropriate selection of the structural materials and by a deliberate control of the water chemistry. The operating experience with KWU steam generators confirms the present and the future steam generator concept followed by KWU.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号