首页 | 官方网站   微博 | 高级检索  
     

下向进路充填采矿法人工假顶强度及配筋参数研究
引用本文:黄丹,郑志杰,崔松.下向进路充填采矿法人工假顶强度及配筋参数研究[J].现代矿业,2019,35(9):43-46.
作者姓名:黄丹  郑志杰  崔松
作者单位:1.北京矿冶科技集团有限公司;2.国家金属矿绿色开采国际联合研究中心
基金项目:* 国家重点研发计划(编号:2016YFC0600709);国家科技支撑计划(编号:2015BAB13B01,2015BAB12B01,2015BAB14B01)。
摘    要:构筑人工假顶是下向进路充填安全高效采矿的关键和前提,人工假顶充填体强度与配筋参数相互关联,直接决定着回采作业的安全性与经济性。通过建立顶板多层充填体普氏平衡拱模型,优化下向进路充填假顶所受荷载的计算方法;应用薄板理论及弹性力学理论并结合下向进路充填采矿工艺,解析充填体假顶强度要求;将钢筋混凝土结构设计方法应用于下向进路充填假顶配筋率计算,形成下向充填采矿人工假顶强度及配筋率的整体方案。以某金银矿山大结构参数(5 m×5 m)回采进路为例,提出假顶厚2 m,充填体强度不小于5 MPa,Φ12 mm钢筋(HRB335)网度300 mm×300 mm,配筋率0.106%的技术要求,对合理构筑人工假顶和安全高效应用下向进路充填采矿法具有指导意义。

关 键 词:下向进路充填人工假顶  充填体强度  配筋率  多层普氏拱模型  薄板理论  钢筋混凝土结构  

Study on the Strength and Reinforcement Ratio of the Artificial Roof of Underhand Drift Cut-and-fill Stoping
HUANG Dan,ZHENG Zhi-Jie,CUI Song.Study on the Strength and Reinforcement Ratio of the Artificial Roof of Underhand Drift Cut-and-fill Stoping[J].Modern Mining,2019,35(9):43-46.
Authors:HUANG Dan  ZHENG Zhi-Jie  CUI Song
Affiliation:1.BGRIMM Technology Group;2.National Center for International Joint Research on Green Metal Mining
Abstract:Constructing the artificial roof is the key and precondition of safe and efficient cut-and-fill mining in underhand drift stoping.Filling strength and reinforcement ratio of the artificial roof are correlative and related to the safety and economics of ore extraction directly.The method of computing the bearing load of the artificial roof is optimized by constructing a multi-layered pressure-arch model.Based on thin plate theory,elastic mechanics theory and the mining technology of underhand drift cut-and-fill stoping,the strength of the backfilling artificial roof is resolved.The design method of reinforced concrete structure is applied to compute the reinforcement ratio of the bearing layer of underhand drift cut-and-fill stoping.The whole scheme design of the artificial roof's strength and reinforcement ratio is presented,and for one gold-silver mine that applied large structural parameter (5 m×5 m),the strength and reinforcement ratio are determined.The thickness of the artificial roof is 2 m,the strength is no less than5 Mpa,bar-mat reinforcement (12mm HRB335) is 300 mm×300 mm,the ratio of reinforcement is 0.106%.The research is instructive and meaningful to constructing the artificial roof and applying underhand drift cut-and-fill mining method safely and efficiently.
Keywords:Artificial roof of underhand drift cut-and-fill stopping  Filling strength  Reinforcement ratio  Multi-layered pressure-arch model  Thin plate theory  Reinforced concrete structure  
本文献已被 CNKI 等数据库收录!
点击此处可从《现代矿业》浏览原始摘要信息
点击此处可从《现代矿业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号