首页 | 官方网站   微博 | 高级检索  
     

工程量清单招投标阶段工程造价控制工作重点
引用本文:李红卫. 工程量清单招投标阶段工程造价控制工作重点[J]. 江苏建筑, 2007, 0(1): 74-75
作者姓名:李红卫
作者单位:上海协同工程监理造价咨询有限公司江苏分公司,江苏南京,210036
摘    要:工程量清单计价在招投标阶段工程造价控制工作重点为:注重工程量清单编制工作;注重标底的编制审核;重视评标、询标工作,合理低价中标;慎重确定合理的合同.

关 键 词:工程量清单计价  招投标  标底  合同
文章编号:1005-6270(2007)01-0074-02
收稿时间:2006-11-16
修稿时间:2006-11-16

Some Keypoints in Controlling Construction Cost at the Bidding Stage of Quantity List Evaluation
LI Hong-wei. Some Keypoints in Controlling Construction Cost at the Bidding Stage of Quantity List Evaluation[J]. Jiangsu Construction, 2007, 0(1): 74-75
Authors:LI Hong-wei
Abstract:The paper introduces some keypoints in controlling construction cost at the stage of quantity list evaluation, it must attach importance to compiling quantity list, checking the bidding price ; winning bid in reasonable low price with careful bidding price evaluation and consultation;The reasonable contract should be confirmed.
Keywords:quantity bill price    bidding   bidding price    contract
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号