首页 | 官方网站   微博 | 高级检索  
     

优化闸门调度条件下提高岸墙小水电发电功率之探索
引用本文:刘红军,戴兴标. 优化闸门调度条件下提高岸墙小水电发电功率之探索[J]. 南水北调与水利科技(中英文), 2010, 8(2): 46-48. DOI: 10.3969/j.issn.1672-1683.2010.02.013
作者姓名:刘红军  戴兴标
作者单位:江苏省灌溉总渠管理处,江苏准安,223200
摘    要:高良涧闸管理单位采用不平衡的闸门调度,适当调整边孔闸门开启高度的方法,降低位于边孔内小水电的流道口水位,增加小水电尾水动能,提高机组的发电功率。运用边孔闸门开启模型计算数据指导工程运行,取得良好的效益。文章还总结了闸门调度和水电发电功率关系实验。

关 键 词:岸墙小水电  发电功率  优化闸门调度

Study on How to Raise the Generated Output of the Small Hydropower Stations of Quay Wall Style in Optimizing the Gate Operation
LIU Hong-jun,DAI Xing-hiao. Study on How to Raise the Generated Output of the Small Hydropower Stations of Quay Wall Style in Optimizing the Gate Operation[J]. South-to-North Water Transfers and Water Science & Technology, 2010, 8(2): 46-48. DOI: 10.3969/j.issn.1672-1683.2010.02.013
Authors:LIU Hong-jun  DAI Xing-hiao
Affiliation:Jiangsu Irrigation Canal Administration/a>;Huaian 223200/a>;China
Abstract:The Gaoliangjian Gate institution adopts the imbalance gate operation pattern,which means that to reduce the water level of the hydroturbine entry in the lateral opening,by adjusting the opening height of the lateral opening gate,and to increase the kinetic energy of fail water,and to raise the generated output of the small hydropower stations.The article sums up the relationship between the gate operation pattern and the generated output.The opening height datum of the lateral opening gate model is apply t...
Keywords:the small hydropower stations of quay wall style  generated output  optimize the gate operation  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号