十二孔闸改建工程抢工措施探讨
引用本文:赵晓晖,张玉,康抗.十二孔闸改建工程抢工措施探讨[J].河北水利水电技术,2011(4):58-61.
作者姓名:赵晓晖  张玉  康抗
作者单位:河北省大清河河务管理处,河北保定071051
摘    要:十二孔闸改建工程因"引黄补淀"要求,工期由原来设计的10个月压缩为两个半月,改建工程项目部克服多项困难组织抢工,在抢工过程中出现一些不足之处给抢工任务造成不利影响,该文着重分析抢工措施中的不足之处及提出应该注意的问题。

关 键 词:抢工措施  施工难点  措施缺陷  提出建议

Measures of Urgent Work in Twelve Holes Sluice Reconstruction Project
ZHAO Xiao-hui,ZHANG Yu,KANG Kang.Measures of Urgent Work in Twelve Holes Sluice Reconstruction Project[J].Hebei Water Resources and Hydropower Engineering,2011(4):58-61.
Authors:ZHAO Xiao-hui  ZHANG Yu  KANG Kang
Affiliation:(Management of Daqinghe River in Hebei Province,Baoding 071051,China)
Abstract:The project of rebuilding the Twelve Water Gate,which duration of ten months from the original design into a two and a half months reason for Yellow River-Baiyangdian water diversion project.The Department of reconstruction projects overcomed many difficulties and organized rob workers.Some flaws during construction rush caused the adverse impact to the construction.This article focuses on the deficiencies of engineering measures to grab and issues should be noted.
Keywords:grab public measures  construction difficulties  measures defects  recommendations