600MW机组RB性能试验
引用本文:张红光.600MW机组RB性能试验[J].华东电力,1999(11).
作者姓名:张红光
作者单位:江苏省电力试验研究所!南京210029
摘    要:介绍扬州第二电厂600 MW 机组RB控制策略,分析了原控制思想的不足,提出大机组RB试验应在对机组运行特性反复进行试验的基础上采取变参数控制、前馈控制及超驰控制等特殊控制手段。

关 键 词:600MW机组  RB  性能试验

Run Back Performance Test for 600 MW Unit of Yangzhou No.2 Power Plant
Zhang Hongguang,Jiangsu Electric Power Test & Research Institute,Nanjing.Run Back Performance Test for 600 MW Unit of Yangzhou No.2 Power Plant[J].East China Electric Power,1999(11).
Authors:Zhang Hongguang  Jiangsu Electric Power Test & Research Institute  Nanjing
Affiliation:Zhang Hongguang Jiangsu Electric Power Test & Research Institute Nanjing 210029
Abstract:The RunBack Control strategy of Yangzhou No.2 Power Plant 600 MW Unit is introduced.Analysis on the inadequacy of the existing control concept is made.and the conclusion is special control methods such as parameter variation control,feedforward control and overriding control should be adopted on the basis of repeated tests of operating characteristics.
Keywords:MW unit  run back  characteristic test  