水利工程隧洞施工超欠挖控制
引用本文:肖海晖.水利工程隧洞施工超欠挖控制[J].山西水利科技,2014(3):36-37.
作者姓名:肖海晖
作者单位:山西省水利建筑工程局山西太原030006
摘    要:分析隧洞开挖超欠挖的影响因素,阐述实际施工中对超欠挖控制解决的方法与途径,包括提高人工钻井的精度,解决好爆破参数的匹配,做好测量放样的控制,随着地质条件的变化调整爆破参数及施工方法,强化现场施工组织管理等。

关 键 词:隧洞  新奥法  周边孔  光面爆破  超挖  欠挖  控制

Controlling Over-excavation and Under-excavation in the Process to Construct Hydraulic Tunnel
XIAO Hai-hui.Controlling Over-excavation and Under-excavation in the Process to Construct Hydraulic Tunnel[J].Shanxi Hydrotechnics,2014(3):36-37.
Authors:XIAO Hai-hui
Affiliation:XIAO Hai-hui
Abstract:The paper analyzes the factors that influences the over-excavation and under-excavation in the process to construct a hydraulic tunnel and states the methods and ways to control and solve the over-excavation and under- excavation problems, including raising the accuracy of manual drilling, making good adaptation of the blasting parameters, doing good control on setting-out survey, adjusting blasting parameters and construction methods in pace with the change of geological conditions, strengthening the construction organization management in situ etc.
Keywords:tunnel  new Austrian tunneling method (NATM)  peripheral hole  smooth blasting  over-excavation  under-excavation  control