太行山隧道施工工期的风险概率性分析
引用本文:李永德.太行山隧道施工工期的风险概率性分析[J].铁路工程造价管理,2007,22(4):8-10.
作者姓名:李永德
作者单位:铁道第三勘察设计院集团有限公司,工经处,天津,300142
摘    要:石家庄至太原客运专线控制工期的关键工程是全长27.8km的太行山特长隧道,该隧道设计为2座单线隧道。此文对太行山特长隧道施工工期进行风险概率性分析,提出了较为合理的施工工期。

关 键 词:太行山隧道  工期  风险概率性分析
文章编号:1007-9890(2007)04-0008-03
修稿时间:2007-03-26

Analysis of risk probability of construction time for Taihangshan tunnel
Li Yongde.Analysis of risk probability of construction time for Taihangshan tunnel[J].Railway Engineering Cost Management,2007,22(4):8-10.
Authors:Li Yongde
Abstract:Of the Shijiazhuang - Taiyuan passenger dedicated line, the key point in construction controlling the time schedule is the 27.8km long Taihangshan extra - long tunnel which is of a two single - tracked tunnel. This article performs an analysis of the risk probability of the construction time for this tunnel and proposes a comparatively reasonable construction time for the same.
Keywords:Taihangshan tunnel  construction time  analysis of risk probability