水平井连续油管冲砂与分流实验装置的研制
引用本文:谢宾,陆灯云,张剑,刘静.水平井连续油管冲砂与分流实验装置的研制[J].天然气工业,2009,29(11):67-69.
作者姓名:谢宾  陆灯云  张剑  刘静
作者单位:川庆钻探工程公司井下作业公司
基金项目:本文方中国石油天然气集团公司科研项目"水平井砂粒输送与液体分流室内实验方法研究"( 
摘    要:水平井作为油气藏开发的有效手段在世界范围内得到迅速而广泛地推广。水平井钻井技术在我国经过几十年的发展已逐渐成熟,然而水平井试修井技术还相当薄弱,多局限于现场的实践经验。为解决目前国内水平井试修研究中实验装置欠缺、研究基础薄弱的状况,以相似性原理为依据,以川渝气区磨溪气田水平井井筒为模拟对象,结合连续油管在川渝气区水平井的运用现状,研制出水平井井筒连续油管沉砂携带与孔眼分流室内模拟实验装置。经测试,该装置能模拟38.1 mm连续油管在139 mm套管的水平井井筒内替液、冲砂、携砂以及液体在水平井段孔眼中的分流、排液等方面的研究工作。

关 键 词:水平井  连续油管  模拟  实验装置  研制  磨溪气田

Development of experimental facilities for sand washing and fluid diverting of coiled tubing in horizontal wells
XIE Bing,LU Deng-yun,ZHANG Jian,LIU Jing.Development of experimental facilities for sand washing and fluid diverting of coiled tubing in horizontal wells[J].Natural Gas Industry,2009,29(11):67-69.
Authors:XIE Bing  LU Deng-yun  ZHANG Jian  LIU Jing
Affiliation:Downhole Service Company, CNPC Chuanqing Drilling Engineering Co., Ltd., Chengdu 610051, China
Abstract:As an effective means for oil and gas reservoir development, horizontal well technology has been applied rapidly and widely all over the world. In China, the horizontal well drilling is becoming mature over the last decades. However, the technology for workover operations in horizontal wells is still under development, most relying on field practice. Because of the low research level and for lack of experimental facilities for horizontal well workover in China, a set of simulating facilities were developed to study sand carrying and fluid diverting during sand flushing operation in horizontal wells by coiled tubing with the similarity principle as a theoretical basis, the horizontal wellbores at Moxi gasfield in the Sichuan Basin as the simulating ob-jects, and the current status of application of coiled tubing in horizontal wells in the Sichuan Basin as a reference. The devel-oped experimental facilities are proved to be able to simulate the fluid displacement, sand washing, sand carrying, fluid divert-ing and discharging when operating with 38. 1 mm-in-diameter coiled tubing in 139 mm-in-diameter cased horizontal wellbore.
Keywords:horizontal well  coiled tubing  simulation  experimental facilities  development  workover  sandwashing