首页 | 官方网站   微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 406 毫秒
1.
The new test facility ELISE (Extraction from a Large Ion Source Experiment) has been designed and installed since November 2009 at IPP Garching to support the development of the radio frequency driven negative ion source for the Neutral Beam System on ITER. The test facility is now completely assembled; all auxiliary systems have been commissioned and are operational. First plasma and beam operation is starting in October 2012.The source is designed to deliver an ion beam of 20 A of D? ions, operating at 0.3 Pa source pressure at an electron to ion current ratio below 1. Beam extraction is limited to 60 kV for 10 s every 3 minutes, while plasma operation of the source can be performed continuously for 1 hour. The ion source and extraction system have the same width as the ITER source, but only half the height, i.e. 1 × 1 m2 source area with an extraction area of 0.1 m2. The aperture pattern of the extraction system and the multi driver source concept stay as close as possible to the ITER design. Easy access to the source for diagnostic tools or modifications allows to analyze and optimize the source performance. Among other possibilities many different magnetic filter field configurations inside the source can be realized to enhance the negative ion extraction and to reduce the co-extraction of electrons. Beam power and profiles are measured by calorimetry and thermography on an inertially cooled target as well as by beam emission spectroscopy. Cs evaporation into the source is done via two dispenser ovens.  相似文献   

2.
The Neutral Beam Test Facility, which will be built in Padova, Italy, is aimed at developing the ITER heating neutral beam injector (HNB) and at testing and optimizing its operation up to nominal performance before installation on ITER. It requires the development of two independent experiments referred to as SPIDER (source for production of ions of deuterium extracted from Rf plasma) and MITICA (megavolt ITer injector & concept advancement). SPIDER will explore the full-size negative ion source for ITER, whereas MITICA will explore the full-size ITER neutral beam injector. Both experiments will be designed for long-pulse operation, up to 3600 s, as ITER itself. MITICA includes three functional components: the heating neutral beam injector plant system (HNB), which is the device under test; the auxiliary plant system (AUX), which includes all equipment to operate the HNB in the test facility (e.g. the local electric grid to feed the HNB power supplies), and MITICA supervisory system that is an electronics/informatics infrastructure to operate the facility. The paper introduces the requirements for the control and data acquisition systems of the experiments and proposes a preliminary design for both systems. SPIDER, which is preparatory to MITICA and will be developed on a shorter time scale, has no constraints coming from ITER CODAC, whereas MITICA includes the ITER neutral beam injector and therefore must be fully compatible with ITER CODAC.  相似文献   

3.
In the MITICA research program for the construction of the ITER Neutral Beam Injector prototype, a Laboratory for the investigation on high voltage holding in vacuum has been set up. This Laboratory - HVPTF: High Voltage Padova Test Facility - is presently capable of experiments up to 300 kV dc, and planned for the upgrade to 800 kV. The specific mission for this ancillary lab is the support to the electrostatic design and construction of the MITICA accelerator and the development and testing of HV components to be installed inside the MITICA accelerator during its operation.The paper describes the structure of the lab, characterized by a high degree of automation and reports the results of the commissioning at 300 kV and the first results of voltage holding between test electrodes.  相似文献   

4.
《Fusion Engineering and Design》2014,89(9-10):2378-2382
The ITER Neutral Beam cell will include a suite of Remote Handling equipment for maintenance tasks. This paper summarises the current status and recent developments in the design of the ITER Neutral Beam Remote Handling System. Its concept design was successfully completed in July 2012 by CCFE in the frame of a grant agreement with F4E, in collaboration with the ITER Organisation, including major systems like monorail crane, Beam Line Transporter, beam source equipment, upper port and neutron shield equipment and associated tooling. Research and development activities are now underway on the monorail crane radiation hardened on-board control system and first of a kind remote pipe and lip seal maintenance tooling for the beam line vessel, reported in this paper.  相似文献   

5.
The ITER neutral beam system is using inductively coupled radio frequency (RF) ion sources, that have demonstrated the required ITER parameters on (small) sources with extraction areas up to 200 cm2. As a next step towards the full size ITER source IPP is presently constructing the test facility ELISE (“Extraction from a Large Ion Source Experiment”) operating with a “half-size” source which has approximately the width but only half the height of the ITER source. The modular driver concept is expected to allow a further extrapolation to the full size in one direction to be made. The main aim of this experiment is to demonstrate the production of a large uniform negative ion beam with ITER relevant parameters in stable conditions up to one hour.Plasma operation of the source is foreseen to be performed continuously for 1 h; extraction and acceleration of negative ions up to 60 kV is only possible in pulsed mode (10 s every 180 s) due to limitations of the existing IPP HV system. The design of the source and extraction system implements a high experimental flexibility and a good diagnostic access while still staying as close as possible to the ITER design. The main differences are the source operating in air and the use of a large gate valve between the source and the target chamber.ELISE is expected to start operation at the end of 2011 and is an important step for the development of the ITER NBI system; the experience gained early will support the design as well as the commissioning and operating phases of the PRIMA NBI test facilities and the ITER neutral beam system.  相似文献   

6.
The test facility ELISE which was constructed in the last three years at the Max-Planck-Institut für Plasmaphysik (IPP), Garching, is an important intermediate step of the development of the neutral beam system for ITER. ELISE allows gaining an early experience of the performance and operation of large RF driven sources for negative hydrogen ions and will give an important input for the commissioning and the design of the SPIDER and MITICA test facilities at Padua and the ITER neutral beam system. ELISE has gone recently into operation with first plasma and beam pulses. The experiments aim at the demonstration of an ion beam at the required parameters within 2 years of operation until end of 2014, the end of the service contract with F4E for the establishment and exploitation of ELISE.  相似文献   

7.
8.
In the ITER heating Neutral Beam Injector (NBI), a High Voltage air-insulated platform (named High Voltage Deck, HVD) will be installed to host the Ion Source and Extractor Power supply system and associated diagnostics referred to ?1 MV DC potential. All power and control cables are routed from the HVD via a feedthrough (HV bushing) to the gas insulated transmission line which feeds the Injector.The paper focuses on insulation and mechanical issues for both HVD and HV bushing which are very special components, far from the present industrial standards as far as voltage (?1 MV DC) and dimensions are concerned. For this purpose, a preliminary design of the HVD has been carried out as concerns the mechanical structure and external shield. Then, the structure has been verified with a seismic analysis applying the seismic load excitation specified for the ITER construction site (Cadarache) and carrying out verifications according to relevant international standards. As regards the HV bushing design, proposals for the complex inner conductor structure and for interfaces to the HVD and transmission line are outlined; alternative installation layouts (aside or underneath the HVD) are compared from both mechanical and electrical points of view.  相似文献   

9.
The 100 keV Ion Source Test facility – Source for the Production of Ions of Deuterium Extracted from RF plasma (SPIDER) – is aimed to test the full scale prototype of the Ion Source for the ITER 1 MeV Neutral Beam Injector (NBI). The SPIDER facility requires the construction of a High Voltage Deck (HVD) and of a High Voltage Transmission Line (TL) respectively to host the Ion Source Power Supplies system polarized at 100 kV and to carry the power and signal conductors to the beam accelerator.In already existing NBI systems with beam energy above 100 keV, the TL is realized with the SF6 Gas Insulated Line technology. In the SPIDER TL case, the presence of a large inner conductor (half meter diameter), would make the pressurized TL a complex and costly component; therefore a free air insulated solution has been proposed. The paper focuses on the design of this TL, which has to host inside the complex high potential (100 kV) inner electrode a number of power and measuring conductors and has to minimize the Electro Magnetic Interferences (EMI) produced by the frequent grids breakdowns.Finite Element (FE) analyses have been performed to verify the configuration from the electrostatic point of view, to evaluate EMI screening effectiveness and to assess the impact of the relatively high thermal dissipation of power conductors located inside the high potential electrode. Moreover, an experimental test campaign has been carried out on a TL mockup to validate the TL electrostatic configuration under DC voltage. Finally, the paper reports on the status of procurement activities for the Transmission Line.  相似文献   

10.
This paper reviews the on-going design, R&D and procurement activities, mostly conducted within the ITER framework, on-going in Europe under the co-ordination of Fusion for Energy (F4E), in co-operation with the European Fusion Associations and aimed at the establishment of the ITER Heating Neutral Beam (HNB) system.  相似文献   

11.
Maintenance-free RF sources for negative hydrogen ions with moderate extraction areas (100-200 cm2) have been successfully developed in the last years at IPP Garching in the test facilities BATMAN and MANITU. A facility with larger extraction area (1000 cm2), ELISE, is being designed with a “half-size” ITER-like extraction system, pulsed ion acceleration up to 60 kV for 10 s and plasma generation up to 1 h. Due to the large size of the source, the magnetic filter field (FF) cannot be produced solely by permanent magnets. Therefore, an additional magnetic field produced by current flowing through the plasma grid (PG current) is required. The filter field homogeneity and the interaction with the electron suppression magnetic field have been studied in detail by finite element method (FEM) during the ELISE design phase. Significant improvements regarding the field homogeneity have been introduced compared to the ITER reference design. Also, for the same PG current a 50% higher field in front of the grid has been achieved by optimizing the plasma grid geometry. Hollow spaces have been introduced in the plasma grid for a more homogeneous PG current distribution. The introduction of hollow spaces also allows the insertion of permanent magnets in the plasma grid.  相似文献   

12.
The negative ion accelerators that produce the high-energy particle beams for the neutral injection systems for the International Tokamak Experimental Reactor (ITER) also produce unwanted particles such as electrons. These electrons are emitted in a wide angular spectrum that allows some of them to directly intercept sensitive beamline components such as the cryogenic pumps. As the electrons are also subject to backscattering, indirect interception always occurs. In this article the electron spectra produced by the Heating Neutral Beam (HNB) and Diagnostic Neutral Beam (DNB) accelerators are calculated. It is shown that these are very different. It is proposed to install electron dumps in the beamlines to intercept electron power directed towards inconvenient places in the HNB and DNB beamlines.  相似文献   

13.
The design of ITER Neutral Beam Injector (NBI) is based on a five-stage electrostatic accelerator, known as Multi-Aperture Multi-Grid (MAMuG) and characterised by an overall acceleration voltage of ?1 MV. The MAMuG accelerator requires a five-stage power supply system under strict load protection requirements, being subjected in operation to breakdowns. In this paper a circuit model of ITER Neutral Beam Injector power supplies and MAMuG accelerator is illustrated, for the simulation of fast transients related to accelerator breakdowns in particular. Consideration of the high voltage involved and of the complex inductive and capacitive couplings implied careful assessment of stray parameters by calculations with finite element techniques. The circuit model, developed to address a number of design issues requiring simulations at system level, is now ready for use—the optimisation of passive protections being the most significant application.  相似文献   

14.
The ITER Heating Neutral Beam injectors will be implemented in three steps: development of the ion source prototype, development of the full injector prototype, and, finally, construction of up to three ITER injectors. The first two steps will be carried out in the ITER neutral beam test facility under construction in Italy. The ion source prototype, referred to as SPIDER, which is currently in the development phase, is a complex experiment involving more than 20 plant units and operating with beam-on pulses lasting up to 1 h. As for control and data acquisition it requires fast and slow control (cycle time around 0.1 ms and 10 ms, respectively), synchronization (10 ns resolution), and data acquisition for about 1000 channels (analogue and images) with sampling frequencies up to tens of MS/s, data throughput up to 200 MB/s, and data storage volume of up to tens of TB/year. The paper describes the architecture of the SPIDER control and data acquisition system, discussing the SPIDER requirements and the ITER CODAC interfaces and specifications for plant system instrumentation and control.  相似文献   

15.
The SPIDER and MITICA experiments, planned to be built at Consorzio RFX for the development and optimization of the ITER Heating and Current Drive Neutral Beam Injectors, feature a number of components intercepted by high heat fluxes, that must be cooled during operations by means of suitable high performance cooling systems. As the design for such cooling systems presents some technological and heat transfer issues, a specific R&D program has been carried out, particularly referred to the accelerator grids that are among the most critical components.These components are foreseen to be manufactured by electrodeposition of pure copper onto a copper base plate to realize cooling channels and magnets slots, while the connection with the feeding manifolds is foreseen to be realized by friction welding or electron beam welding.Suitable manufacturing parameters and production methodologies have been identified by constructing and testing a first series of prototypes. A set of thermocouples have been embedded in some prototypes, to allow the evaluation of local heat transfer coefficients and the identification of local spots where dry-out phenomena might occur. To this purpose, a dedicated electrodeposition process has been developed.  相似文献   

16.
This paper deals with the requirements, operational modes and design of the cooling system for the ITER Neutral Beam test experiments. Different operating conditions of the experiments have been considered in order to identify the maximum heat loads that constitute, with the inlet temperature and pressure at each component, the design requirements for the cooling system.The test facility components will be actively cooled by ultrapure water realizing a closed cooling loop for each group of components. Electrochemical corrosion issues have been taken into account for the design of the primary cooling loops and of the chemical and volume control system that will produce water with controlled resistivity and pH. Draining and drying systems have been designed to evacuate water from the components and primary loops in case of leakage, and to carry out leak detection.Tritium concentration, water resistivity and pH will be measured and monitored at each primary loop for safety reasons and high voltage holding reliability. The measured water flow rates and temperatures will be used to calculate the exchanged heat fluxes and powers. Flow regulating valves and speed of variable driven pumps will be adjusted to control the component temperatures in order to fulfil the functional and thermohydraulic requirements.  相似文献   

17.
In the context of the ITER contract “ITER/CT/07/219–200 kV Stored Energy Tests”, electrical breakdown tests have been performed in vacuum with a stored energy of up to 425 J. The experiments have been conceived and performed with the collaboration of Consorzio RFX. The tests are being performed in the 1 MV test facility at IRFM, CEA-Cadarache. They should simulate the conditions that will be found in the ITER Neutral Beam accelerator, at 200 kV. This paper presents the set-up of the test bed, the choice of critical components, the diagnostic equipments and the results obtained with 200 kV applied on the anode electrode.  相似文献   

18.
The ITER remote handling (RH) maintenance system is a key component in ITER operation both for scheduled maintenance and for unexpected situations. It is a complex collection and integration of numerous systems, each one at its turn being the integration of diverse technologies into a coherent, space constrained, nuclearised design. This paper presents an integrated view and recent results related to the Blanket RH System, the Divertor RH System, the Transfer Cask System (TCS), the In-Vessel Viewing System, the Neutral Beam Cell RH System, the Hot Cell RH and the Multi-Purpose Deployment System.  相似文献   

19.
This paper describes the compater control and data acquisition system for the Tokamak Fusion Test Reactor (TFTR) Neutral Beam injectors. The system provides hardware and software to permit remote operation of the four beamlines on TFTR, each containing up to three ion sources, and for a single-source beamline for the TFTR test stand.  相似文献   

20.
The energy stored in the 1 MV ITER Neutral Beam Injector power supply system will exceed by far the energy stored in the existing largest NB Injectors; as a consequence, the limitation of the grid breakdown effects–grids damage and Electro Magnetic Interference emission–are critical issues. In the present ITER NBI reference design the mitigation system is based on the concept of the concentrated core snubber which, due to the large amount of stored energy, is a huge component. Furthermore, in the NBI a relatively large part of HV capacitance to ground remains downstream the core snubber, so neither the arc peak current nor the high-frequency oscillations can be effectively limited. Moreover, the concentrated core snubber is ineffective in limiting the voltage reversal caused by internal insulation fault, increasing the risk of cascade failures in components like HV bushing and transmission line. The paper proposes an alternative approach to limit the grid breakdown effects, based on the concepts of Damper Resistor- substituting the direct connection to ground of the zero-potential accelerating grid – and of Distributed Core Snubber (DCS) – installed along the whole length of the transmission lines. The DCS concept has been subjected also to experimental validation by a small scale setup supported by electrical modelling.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号