1.
In this investigation, the performance of Upflow Anaerobic Sludge Blanket (UASB) reactors treating municipal wastewater was evaluated on the basis of: (i) COD removal efficiency, (ii) effluent variability, and (iii) pH stability. The experiments were performed using 8 pilot-scale UASB reactors (120 L) from which some of them were operated with different influent COD (CODInf ranging from 92 to 816 mg/L) and some at different hydraulic retention time (HRT ranging from 1 to 6 h). The results show that decreasing the CODInf, or lowering the HRT, leads to decreased efficiencies and increased effluent variability. During this experiment, the reactors could treat efficiently sewage with concentration as low as 200 mg COD/L. They could also be operated satisfactorily at an HRT as low as 2 hours, without problems of operational stability. The maximum COD removal efficiency can be achieved at CODInf exceeding 300 mg/L and HRT of 6h.  相似文献   

2.
对上流式厌氧反应器(UASB)和折流式厌氧反应器(ABR)处理难降解印染废水进行中试研究。结果表明:在厌氧反应器最佳水力停留时间为24 h条件下,UASB和ABR稳定运行2个多月,在进水COD质量浓度波动较大的情况下(ρmax=1 020.0 mg/L,ρmin=593.6 mg/L,ρ均=755.4 mg/L),UASB和ABR出水平均COD质量浓度分别为409.3 mg/L和420.9 mg/L,平均去除率分别为45.5%和43.9%。两种厌氧反应器对色度去除效果较佳,进水平均色度342倍,出水平均色度分别78倍和80倍,平均去除率分别为77.2%和76.6%。印染废水B/C由0.29分别提高到0.46和0.43,废水可生化性明显改善,UASB较ABR效果好。  相似文献   

3.
The potential of anaerobic digestion in ecological and decentralised sanitation has been investigated in this research. Different anaerobic digestion systems were proposed for the treatment of sewage, grey water, black water and faeces. Moreover, mathematical models based on anaerobic digestion model no.1 (ADM1) were developed for determination of a suitable design for each system. For stable performance of an upflow anaerobic sludge blanket (UASB) reactor treating sewage, the model results indicated that optimisation of wastewater conversion to biogas (not COD removal) should be selected for determination of the hydraulic retention time (HRT) of the reactor. For the treatment of sewage or black water in a UASB septic-tank, the model results showed that the sludge removal period was the main parameter for determination of the HRT. At such HRT, both COD removal and wastewater conversion are also optimised. The model results demonstrated that for treatment of faeces in an accumulation (AC) system at temperature > or = 25 degrees C, the filling period of the system should be higher than 60 days. For maximisation of the net biogas production (i.e. reduction of biogas losses as dissolved in the effluent), the separation between grey water, urine and faeces and reduction of water consumption for faeces flushing are required. Furthermore, the faeces and kitchen organic wastes and grey water are digested in, respectively, an AC system and UASB reactor, while the urine is stored.  相似文献   

4.
In this paper, the feasibility of grey water treatment in a UASB reactor was investigated. The batch recirculation experiments showed that a maximum total-COD removal of 79% can be obtained in grey-water treatment in the UASB reactor. The continuous operational results of a UASB reactor treating grey water at different hydraulic retention time (HRT) of 20, 12 and 8 hours at ambient temperature (14-24 degrees C) showed that 31-41% of total COD was removed. These results were significantly higher than that achieved by a septic tank (11-14%), the most common system for grey water pre-treatment, at HRT of 2-3 days. The relatively lower removal of total COD in the UASB reactor was mainly due to a higher amount of colloidal COD in the grey water, as compared to that reported in domestic wastewater. The grey water had a limited amount of nitrogen, which was mainly in particulate form (80-90%). The UASB reactor removed 24-36% and 10-24% of total nitrogen and total phosphorus, respectively, in the grey water, due to particulate nutrients removal by physical entrapment and sedimentation. The sludge characteristics of the UASB reactor showed that the system had stable performance and the recommended HRT for the reactor is 12 hours.  相似文献   

5.
The aim of this work was to evaluate the performance of a pilot-scale upflow anaerobic sludge blanket (UASB) reactor during the treatment of cereal-processing industry wastewater under low-temperature conditions (17 degrees C) for more than 300 days. The applied organic loading rate (OLR(appl)) was gradually increased from 4 to 6 and 8 kg COD(sol)/m3d by increasing the influent soluble chemical oxygen demand (COD(sol)), while keeping the hydraulic retention time constant (5.2 h). The removal efficiency was high (82 to 92%) and slightly decreased after increasing the influent COD(sol) and the OLR(appl). The highest removed organic loading rate (OLR(rem)) was reached when the UASB reactor was operated at 8 kg COD(sol)/m3d and it was two times higher than that obtained for an OLR(appl) of 4 kg COD(sol)/m3d. Some disturbances were observed during the experimentation. The formation of biogas pockets in the sludge bed significantly complicated the biogas production quantification, but did not affect the reactor performance. The volatile fatty acids in the effluent were low, but increased as the OLR(appl) increased, which caused an increment of the effluent COD(sol). Anaerobic treatment at low temperature was a good option for the biological pre-treatment of cereal processing industry wastewater.  相似文献   

6.
The efficiency of ozone as a pre- and post-treatment to UASB treatment was investigated, followed by a study into UASB reactor performance with ozonated wastewater as substrate. Combinations of pre- and/or post-ozonation with UASB treatment gave better results than ozonation or UASB alone and COD reductions of 53.0-98.9% were achieved for treatment of canning and winery wastewaters. A UASB reactor was fed with pre-ozonated cannery wastewater for over 70 d. COD removal improved from between 58.8 and 64.4% to between 85.3 and 91.8% after pre-ozonated substrate feed commenced. Subsequent increases in organic loading rate (OLR) from 2.4 to 3.4 kgCOD m(-3) x d(-1) did not affect reactor performance. By including a final post-ozonation treatment to this UASB effluent a total COD reduction of 99.2% was achieved.  相似文献   

7.
The objective of this research is to make a novel wastewater treatment process activated by a sulfur-redox cycle action of microbes in low temperature conditions. This action is carried out by sulfate-reducing bacteria (SRB) and sulfur-oxidizing bacteria (SOB). The process was comprised of a UASB reactor as pre-treatment and an aerobic downflow hanging sponge (DHS) reactor as post-treatment. As the results of reactor operation, the whole process achieved that over 90% of CODcr removal efficiency, less than 30 mgCODcr/L (less than 15 mgBOD/L) of final effluent, at 12 h of HRT and at 8 degrees C of UASB reactor temperature. Acetobacterium sp. was detected as the predominant species by PCR-DGGE method targeting 16SrDNA with band excision and sequence analysis. In the UASB reactor, various species of sulfate-reducing bacterium, Desulfobulbus sp., Desulfovibrio sp., and Desulfomicrobium sp., were found by cloning analysis. In the DHS reactor, Tetracoccus sp. presented as dominant. The proposed sulfur-redox action process was considered as an applicable process for low strength wastewater treatment in low temperature conditions.  相似文献   

8.
A 2.0 L volume of EGSB reactor was operated at 20 degrees C for more than 500 days with 0.3-0.4 g COD/L of sucrose base wastewater to investigate the influence of effluent-recirculation on the process performance. At the start up period, the reactor was operated in EGSB mode with 5 m/h upflow velocity by continuous effluent recirculation. The COD loading was set to 7.2-9.6 kg COD/m(3) day with HRT of 1 hour. However, in this mode, EGSB reactor exhibited insufficient COD removal efficiency, i.e., 50-60%. Therefore, UASB mode (without recirculation, 0.7 m/h upflow velocity) was used for 30 minutes in every 40 minutes cycle to increase the COD concentration in the sludge bed. As a result, an excellent process performance was shown. The COD removal efficiency increased from 65% to 91% and the reactor could maintain a good physical property of retained sludge (sludge concentration: 33.4 g VSS/L and SVI: 25 mL/g VSS). Furthermore, retained sludge possessed sufficient level of methanogenic activity at 20 degrees C.  相似文献   

9.
The treatment of grey water in two upflow anaerobic sludge blanket (UASB) reactors, operated at different hydraulic retention times (HRTs) and temperatures, was investigated. The first reactor (UASB-A) was operated at ambient temperature (14-25 degrees C) and HRT of 20, 12 and 8 h, while the second reactor (UASB-30) was operated at controlled temperature of 30 degrees C and HRT of 16, 10 and 6 h. The two reactors were fed with grey water from 'Flintenbreite' settlement in Luebeck, Germany. When the grey water was treated in the UASB reactor at 30 degrees C, total chemical oxygen demand (CODt) removal of 52-64% was achieved at HRT between 6 and 16 h, while at lower temperature lower removal (31-41%) was obtained at HRT between 8 and 20 h. Total nitrogen and phosphorous removal in the UASB reactors were limited (22-36 and 10-24%, respectively) at all operational conditions. The results showed that at increasing temperature or decreasing HRT of the reactors, maximum specific methanogenic activity of the sludge in the reactors improved. As the UASB reactor showed a significantly higher COD removal (31-64%) than the septic tank (11-14%) even at low temperature, it is recommended to use UASB reactor instead of septic tank (the most common system) for grey water pre-treatment. Based on the achieved results and due to high peak flow factor, a HRT between 8 and 12 h can be considered the suitable HRT for the UASB reactor treating grey water at temperature 20-30 degrees C, while a HRT of 12-24 h can be applied at temperature lower than 20 degrees C.  相似文献   

10.
This paper presents an evaluation of the process performance of a pilot-scale "fourth generation" downflow hanging sponge (DHS) post-treatment system combined with a UASB pretreatment unit treating municipal wastewater. After the successful operation of the second- and third-generation DHS reactors, the fourth-generation DHS reactor was developed to overcome a few shortcomings of its predecessors. This reactor was designed to further enhance the treatment efficiency and simplify the construction process in real scale, especially for the application in developing countries. Configuration of the reactor was modified to enhance the dissolution of air into the wastewater and to avert the possible clogging of the reactor especially during sudden washout from the UASB reactor. The whole system was operated at a total hydraulic retention time (HRT) of 8 h (UASB: 6 h and DHS: 2 h) for a period of over 600 days. The combined system was able to remove 96% of unfiltered BOD with only 9 mg/L remaining in the final effluent. Likewise, F. coli were removed by 3.45 log with the final count of 10(3) to 10(4) MPN/100 ml. Nutrient removal by the system was also satisfactory.  相似文献   

11.
This paper presents the performance of a multi-stage biodrum system applied to domestic wastewater treatment. The organic stabilization and nitrogen removal efficiency in the system was investigated at different hydraulic retention times (HRT) of 12, 6 and 3 hours. The rotational speed of the biodrum was examined at 2,4 and 8 rpm. Average organic removal efficiencies in the system at different HRTs of 12, 6 and 3 hours were 96.3, 94.4 and 90.9%. Simultaneously, average nitrogen removal efficiencies were 91.5, 90.6 and 81.0%. The effect of rotational speed on nitrogen removal efficiencies in the system was clearly observed at a low HRT of 3 hours. The experimental results suggested that optimum HRT in the system was 6 hours. Moreover, they revealed that nitrogen removal efficiencies in the reactors operated at different rotational speed were in the same degree when considering the effluent nitrogen concentration. However, the reactors operated at lower rotational speed needed to employ higher numbers of biodrums (4 stages) than the others with higher rotational speed (3 and 2 stages at 4 and 8 rpm.) in order to achieve similar effluent qualities. At a rotational speed of 2 rpm, maximum nitrogen removal rate was found to be 0.2 kg/m3/d.  相似文献   

12.
The operation of two different reactor configurations (UASB and EGSB), while treating medium and low concentrated wastewater (MCW and LCW, respectively), was studied. The MCW (5 g COD/l) was initially supplied for reactor start up and granule maturation, being subsequently changed to the LCW (0.5 g COD/I), with which led the reactors to an unstable state associated with the deterioration of granule characteristics, in terms of extracellular polymeric substances (EPS) content and composition. The addition of pectin as an exogenous EPS was considered as a way to directly act on granule characteristics and its effect was studied by monitoring the operational parameters as well as by following the EPS content and composition within granules and the dynamics of microbial populations. The effect of adding pectin led to a significant recuperation of the operational performance in both reactors, associated with the increase in Archaea relative abundance, this likely related to the major presence of Methanosaeta-like microorganisms in granules with higher activity and stability.  相似文献   

13.
An expanded granular sludge bed (EGSB) reactor was adopted to incubate the sludge biogranule that could simultaneously achieve sulfate reduction and sulfide reoxidization to elemental sulfur for treating molasses distillery wastewater. The EGSB reactor was operated for 175 days at 35 °C with a pH value of 7.0, chemical oxygen demand (COD) loading rate of 4.8 kg COD/(m3 d), and sulfate loading rate of 0.384 kg SO(4)(2-)/(m3 d). The optimal operation parameters, including the oxidation reduction potential (ORP), recycling rate, and hydraulic retention time (HRT), were established to obtain stable and acceptable removal efficiencies of COD, sulfate, and higher elemental sulfur production. With an ORP of -440 mV, a recycling rate of 300%, and HRT of 15 h, the COD and sulfate removal efficiencies were 73.4 and 61.3%, respectively. The elemental sulfur production ratio reached 30.1% when the elemental sulfur concentration in the effluent was 48.1 mg/L. The performance results were also confirmed by the mass balance calculation of sulfate, sulfide, and elemental sulfur over the EGSB reactor.  相似文献   

14.
A promising system consisting of Up-flow Anaerobic Sludge Blanket (UASB) and Down-Flow Hanging Sponge (DHS) system was investigated for removal of COD, BOD(5) fractions, ammonia and faecal coliform from domestic wastewater. The combined system was operated at different HRTs of 16, 11 and 8 h. The results indicate that increasing the total HRT from 8 to 16 h significantly (p < 0.05) improves the COD(total) and BOD(5 total) removal mainly as a result of a higher removal of COD(soluble), BOD(soluble), COD(particulate) and BOD(particulate). The main part of coarse suspended solids was removed in the UASB reactor (76.4+/-18%) and the remaining portion was adsorbed and/or enmeshed and degraded in the biomass of the DHS system. The combined system achieved a substantial reduction of total suspended solids (TSS) resulting in an average overall percentage removal of 94+/-6% (HRT = 16 h) and 89.5+/-7.8% (HRT = 8 h). Faecal coliform reduction was significantly improved when increasing the total HRT from 8 to 16 h. Residual counts of faecal coliform were 3.1 x 10(3)/100 ml at a total HRT of 16 h, and 2.8 x 10(4)/100 ml at total HRT of 8 h, corresponding to overall removal efficiency of 99.97+/-0.03 and 99.6+/-0.3% respectively. Despite the increase of ammonia concentration as a result of protein hydrolysis in the UASB reactor, a substantial removal of ammonia was achieved in the DHS system. The results obtained show that decreasing the OLR imposed to DHS system from 2.6 to 1.6 kg COD/m(3).d significantly (p < 0.05) improves the removal efficiency of ammonia by a value of 29%. However, the removal efficiency of ammonia is not further increased when decreasing the OLR from 1.6 to 1.3 kg COD/m(3).d. The discharged sludge from UASB + DHS system exerts a good settling property and partially stabilized.DHS profile results have shown that the major part of COD, BOD(5), and TSS was removed in the upper part of the system, consequently, the nitrification process was occurring in the lower part of the DHS system.  相似文献   

15.
An upflow anaerobic sludge bed (UASB)-submerged aerated biofilter (SAB) system that treats effluents from a jeans factory was evaluated. The 210-day operational period was divided into three phases (PI, PII and PIII), each with a different hydraulic retention time (HRT in h) and organic loading rate (OLR in kg COD/m3.d). In PI, the best performance was achieved using the UASB (HRT 24, OLR 1.3) with COD and color removal efficiencies of 59 and 64%, respectively; the corresponding values were 77 and 86% for the final effluent. In PII, the efficiencies were 50 and 55% using the UASB (HRT 16, OLR 1.2), respectively, and 69 and 81% for the final system effluent, respectively. In PIII, the UASB (HRT 12 and ORL 3.2) showed the poorest performance; the efficiencies decreased to 48 and 50%, respectively. The same phenomenon occurred in the system with corresponding efficiencies decreasing to 69 and 61%. Throughout the experiment, the system removal efficiencies were between 57 and 88% for nitrogen and between 14 and 63% for sulfate. The final effluent showed relatively non-toxicity or moderate toxicity using Daphnia magna as an indicator. Therefore, the overall results showed that the use of a sequential anaerobic-aerobic system is promising for treatment of textile industrial wastewater.  相似文献   

16.
Sludge samples from an upflow anaerobic sludge blanket (UASB) reactor and four submerged aerated biofilters (BFs) of a wastewater treatment plant (1,000 inhab.) were processed at bench scale by alkaline and acid hydrolysis with the objective to evaluate the organic matter solubilization, volatile solids (VS) destruction and the effect of hydrolytic processes on the extracellular polymeric substances (EPS) fraction of the sludge samples. The results showed that alkaline hydrolysis of sludge samples treatment with 1.0% total solids (TS) using NaOH 20 meq L(-1) was more efficient on organic matter solubilization and VS destruction than acid hydrolysis. The EPS sludge content was also affected by the alkaline treatment of anaerobic sludge samples. The EPS concentrations (mg EPS/gVSS) on the anaerobic sludge after the alkaline treatment were significantly lowered according to sample height in the UASB reactor. Data indicated that the EPS sludge fraction is the main component affected by the alkaline hydrolytic process of anaerobic sludge samples.  相似文献   

17.
Influence of EPS on fouling of intermittent aeration MBR reactor (denitrification MBR) was investigated changing intermittent aeration cycle (10 minute-cycle and 120 minute-cycle) in laboratory-scale reactors using synthetic wastewater. EPS were extracted from bacterial cells using cation resin method and molecular weight fractioning of EPS was conducted using gel chromatography. In both of the reactors, nitrogen removal rate was almost 100% after 50th day although DO concentration was not very high during the aerated phase because of accumulation of nitrifying bacteria in the reactors. In the 120 minutes-cycle reactor, trans-membrane pressure increased more rapidly than in the 10 minutes-cycle reactor. The reason might be that EPS of more than 1000 kDa, which are the main fouling substances, are produced more rapidly in the 120 minute-cycle condition. It was also found that three peaks at around 100 kDa, 500 kDa and 2000 kDa are prominent in EPS in intermittent-aeration MBR irrespective of cycle and higher molecular weight EPS are decomposed to smaller molecular weight EPS on membrane surface.  相似文献   

18.
In this investigation, the robustness and stability of UASB reactors was evaluated on the basis of four indicators: (i) COD removal efficiency; (ii) effluent variability; (iii) pH stability; and (iv) recovery time. The experiments were carried out using six pilot-scale UASB reactors fed with domestic sewage and operated under different operational conditions. After establishment of a "steady-state", organic and hydraulic shock loads (six times the loading rate during six hours) were imposed. The results show that the UASB reactors are robust systems with regards to COD removal efficiency and pH stability when exposed to shock loads. However, this reactor cannot attenuate the imposed fluctuation in the influent COD. A secondary treatment unit is needed to retain the expelled sludge occurring as a result of a hydraulic shock load, or prior to the shock, a sufficient amount of sludge needs to be discharged from the reactor.  相似文献   

19.
An integrated anaerobic-aerobic treatment system of sulphate-laden wastewater was proposed here to achieve low sludge production, low energy consumption and effective sulphide control. Before integrating the whole system, the feasibility of autotrophic denitrification utilising dissolved sulphide produced during anaerobic treatment of sulphate rich wastewater was studied here. An upflow anaerobic sludge blanket reactor was operated to treat sulphate-rich synthetic wastewater (TOC=100 mg/L and sulphate=500 mg/L) and its effluent with dissolved sulphide and external nitrate solution were fed into an anoxic biofilter. The anaerobic reactor was able to remove 77-85% of TOC at HRT of 3 h and produce 70-90 mg S/L sulphide in dissolved form for the subsequent denitrification. The performance of anoxic reactor was stable, and the anoxic reactor could remove 30 mg N/L nitrate at HRT of 2 h through autotrophic denitrification. Furthermore, sulphur balance for the anoxic filter showed that more than 90% of the removed sulphide was actually oxidised into sulphate, thereby there was no accumulation of sulphur particles in the filter bed. The net sludge productions were approximately 0.15 to 0.18 g VSS/g COD in the anaerobic reactor and 0.22 to 0.31 g VSS/g NO3- -N in the anoxic reactor. The findings in this study will be helpful in developing the integrated treatment system to achieve low-cost excess sludge minimisation.  相似文献   

20.
One of the major challenges of anaerobic technology is its applicability for low strength wastewaters, such as sewage. The lab-scale design and performance of a novel Gradual Concentric Chambers (GCC) reactor treating low (165+/-24 mg COD/L) and medium strength (550 mg COD/L) domestic wastewaters were studied. Experimental data were collected to evaluate the influence of chemical oxygen demand (COD) concentrations in the influent and the hydraulic retention time (HRT) on the performance of the GCC reactor. Two reactors (R1 and R2), integrating anaerobic and aerobic processes, were studied at ambient (26 degrees C) and mesophilic (35 degrees C) temperature, respectively. The highest COD removal efficiency (94%) was obtained when treating medium strength wastewater at an organic loading rate (OLR) of 1.9 g COD/L.d (HRT = 4 h). The COD levels in the final effluent were around 36 mg/L. For the low strength domestic wastewater, a highest removal efficiency of 85% was observed, producing a final effluent with 22 mg COD/L. Changes in the nutrient concentration levels were followed for both reactors.  相似文献   