首页 | 官方网站   微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
LI  Wen-long 《中国海洋工程》2003,17(4):541-550
The floating oil storage system has been proposed as a new facility for Strategic Petroleum Reserve (SPR) in China. Mooring is one of the key technologies to ensure the safety, reliability, and performance of the oil storage system. This paper describes the concept, analysis, design and reliability of the mooring system. For mooring system design of these oil vessels, analysis is essential of the behavior of the vessel in connection with mooring facilities of nonlinear resilience. A nonlinear mathematical model for analyzing a moored vessel is established and solved. Some results of numerical simulations are presented. Assessment of the safety regarding the mooring system in terms of failure probability is carried out. Another simulation model for calculating the failure probability of the mooring system is proposed. The design parameters that have an influence on the characteristics of the failure probability have been identified. The simulation results show that the mooring system has an annual reliab  相似文献   

2.
3.
介绍了采用座底式轻型仪器架进行30 m以内浅水深海流观测的两种系统布放方法:先锚后仪器架法和先仪器架后锚法。其中,详细介绍了先锚后仪器架法的布放过程,对先仪器架后锚法作了简要介绍。  相似文献   

4.
Design Curves for Mooring Lines of Turret Mooring Systems   总被引:1,自引:0,他引:1  
This paper presents a series of design curves to aid in the selection of turret mooring systemsfor tankers based Floating Production Storage and Offloading(FPSO)systems.These curves are appropri-ate to water depths ranging from 100m to 600m.The curves can be used as a preliminary design tool,al-lowing the designer to quickly evaluate alternative mooring system configurations,including the numberof mooring lines,the characteristics of chain and wire rope to be deployed and the initial tension.With aknowledge of the total environmental force and vessel motion characteristics,the designer can determinethe appropriate system for closer evaluation.  相似文献   

5.
通过对网箱框架、网衣在风、浪、流作用下的受力分析 ,建立网箱锚泊系统缆绳受力计算的数学模型。以国家十五“86 3”计划课题—“深海抗风浪网箱的研制”所设计的网箱为例 ,选定山东荣成市寻山海域 1 0年一遇的灾害海况为设计计算条件 ,根据 Morison公式 ,采用 Goodman- L ance方法求得单个网箱的锚泊力为 6 5 .6 7k N。在此基础上对网箱的锚泊系统进行设计 ,确定了锚泊系统每只锚重 2 5 0 kg,锚链重为 1 5 0 kg,缆绳长度为 33m。  相似文献   

6.
为保证深水钻井作业过程中锚泊系统的安全性,降低事故发生率,提高事故应急处置能力,基于故障树、工作安全分析等风险分析方法,并结合锚泊系统自身特性,设计深水半潜式平台锚泊系统风险分析流程。依据钻井作业周期顺序,从抛锚、钻井作业及起锚阶段设计锚泊系统作业风险分析流程。搜集统计锚泊系统常见事故类型,设计走锚风险分析流程,建立走锚事故应急程序。结果表明:所设计的锚泊系统风险分析流程能够弥补现有锚泊系统风险分析的不足,为开展锚泊系统全生命周期内的风险分析提供理论指导,为其它锚泊系统风险相关研究提供参考。  相似文献   

7.
A quasi-steady time domain method is developed for the prediction of dynamic behavior of amooring system under the environmental disturbances,such as regular or irregular waves,winds and cur-rents.The mooring forces are obtained in a static sense at each instant.The dynamic feature of the moor-ing cables can be obtained by incorporating the extended 3-D lumped-mass method with the known shipmotion history.Some nonlinear effects,such as the influence of the instantaneous change of the wettedhull surface on the hydrostatic restoring forces and Froude-Krylov forces,are included.Thecomputational results show a satisfactory agreement with the experimental ones.  相似文献   

8.
An engineering numerical model for three-dimensional motion of multichain-buoy mooringsystem in shallow water and survival condition is given in this paper.Shooting-aim method is employedfor solving the dynamic equations of chain system in order to match the computation of buoy motion.Theresponses of buoy and chain have been computed for different wind-wave-current directions and differentrigidity of chain.The results show that the present numerical model is reasonable.  相似文献   

9.
新型深海系泊系统及数值分析技术   总被引:7,自引:1,他引:7  
随着海洋油气资源开发逐渐向深海转移,传统的悬链式系泊系统在技术和经济上遇到难以逾越的障碍。作为一种新型的适用于深水和超深水环境的系泊系统,绷紧索系泊系统面临广阔的应用前景。文章对这种新型系泊系统的发展情况进行了介绍,基于有限元数值分析技术,对系泊系统的两个关键特性,即系缆的绷紧-松弛特性以及纤维系缆的动刚度特性进行了分析和处理,通过算例考察了深海平台运动引起的系缆力响应。  相似文献   

10.
The underwater position of the beacon determined using the conventional mode of the short-baseline acoustic positioning system (SBL system) is usually incorrect due to the inaccuracy of underwater-measured sound speed, which is affected by the environment. This article presents a corrected mode of SBL system to offer a precise solution for the underwater beacon position. The corrected mode using the formulation of Euclidean geometry converges quickly and efficiently, obtaining the precise position of the beacon. Finally, a simulation of coring missions of a vessel is presented to verify the accuracy of the corrected mode of the SBL system.  相似文献   

11.
Multi-component mooring systems become widely used in deep water position-keeping of drilling and production platforms. However, versatile materials make it difficult to design appropriate mooring lines made of several segments. Based on catenary equations of a multi-component mooring line at a specific water depth, this paper establishes a minimum model for designing this kind of lines. The model is solved by Genetic Algorithm and Multi-Objective Planning respectively. The model is verified by its application to a practical mooring design assigranent-a quasi-static analysis for a largesemi-submersible. The optimal result is finally obtained with the aid of design graphs.  相似文献   

12.
The key consideration in controlling the dynamic response of an offshore guyed tower subjected to environmental loading is the selection of the stiffness characteristics of the cable mooring array. In the present study, each cable in the array consists of three segments: a leading segment attached to the tower, a short heavy middle segment, and a seabed trailing segment attached at the extremity to an anchor pile. A nonlinear static model is presented in algorithmic form that defines the stiffness characteristics of the cable array. The model involves the inelastic static catenary equations coupled with conditions of geometric compatibility, formulated in terms of seven nondimensional system parameters. The effects of varying each of the system parameters on the stiffness characteristics of example cable arrays are presented and the implications for cable design are discussed.  相似文献   

13.
As the sustainable exploitation of marine resources develops,dual-platform joint operation has caught increasing attention.Dual-platform joint operation requires smaller relative motion between the two sub-platforms,which is normally difficult to be satisfied by the traditional mooring system.Therefore,a new hybrid mooring system is developed and studied in this article.To ensure safety during platform movements,both the number of anchor chains and the relative motion between the two sub-platfor...  相似文献   

14.
深水半潜式平台系泊锚链的倾角变化是评价平台系泊状态与锚链受力的重要指标,是半潜式平台重要的监测内容。目前,深水锚链的测量主要是采用自容式的传感器,针对其水下长时间测量的应用特点,要求它的设计必须具有低功耗、高可靠性、大存储量、体积小、防水耐压等指标。根据我国南海流花平台的锚链监测需要,设计与制作了专用的水下自容式倾角传感器,并在实际应用中进行了检验。  相似文献   

15.
极区海洋锚碇测流系统的设计和布放   总被引:1,自引:0,他引:1  
中国第二次北极科学考察期间,在白令海峡和北冰洋楚科奇海布放了一套潜标和两套明标,这是我国首次在极区布放锚碇观测系统。潜标和明标在本次考察结束前被成功回收,获得了最长为45 d的连续观测资料。文中通过介绍这次布放过程,对极区锚碇系统的相关技术问题进行了讨论,包括观测站位和层次的选择,锚碇系统的设计,布放步骤等,为在海冰存在的低温海域布放锚碇系统提供参考。  相似文献   

16.
本系统是国家“863”任务中818-02A项目的重要组成部 和高精度CTD测量仪联用,可以完成任意深度、任意时刻的采水控制功能,它采用国内外最新的技术和元器件,打破了原有的采水控制装置的设计思想,使采水器的动作完全合理准确。本文重点介绍其工作原理和关键技术。  相似文献   

17.
—The nonlinear behaviors of plane coupled motions for a given two-point tension mooring sys-tem,are discussed in the present paper.For a cylinder moored by two taut lines under the action ofgravity,buoyance and forces due to wave-current and mooring lines,a mathematical model of motionswith three degrees of freedom is established.The steady solution and stability are analyzed.By integratingthe equations of motions,history,phase map and Poincare map are obtained.The Liapunov exponentsare also computed.The numerical results show that:the horizontal movement will increase,and stabilitywill also increase as the steady force increases.The amplitude of responses will decrease as time-dependentforces decrease.Because of the geometric nonlinearity,there exist many windows bifurcating to pseudo-pe-riodic or multi-periodic solution.The bifurcating patterns may be different.The behaviors are very com-plex.Under wave excitation alone,the motions are nonsymmetrical but still symmetrical statistically.  相似文献   

18.
针对“透明海洋”工程对水下实时、长期、连续观测的迫切需求,开展基于水下绞车的实时传输潜标研制。该型潜标采用水下绞车牵引卫星通信浮标的方式,将潜标上搭载的测量仪器观测数据通过铠装通信缆传输到卫星通信浮标,当卫星通信浮标浮出水面时,再通过卫星通信传输至数据接收处理装置,完成数据传输后,水下绞车牵引卫星通信浮标至海面以下50 m,从而实现潜标系统的实时传输功能。本文详细介绍了基于水下绞车的实时传输潜标系统设计及关键组部件设计,并通过海上试验验证了该型潜标海上应用的可行性。  相似文献   

19.
A design of semi-submersible platform is mainly based on the extreme response analysis due to the forces experienced by the components during lifetime. The external loads can induce the extreme air gap response and potential deck impact to the semi-submersible platform. It is important to predict air gap response of platforms accurately in order to check the strength of local structures which withstand the wave slamming due to negative air gap. The wind load cannot be simulated easily by model test in towing tank whereas it can be simulated accurately in wind tunnel test. Furthermore, full scale simulation of the mooring system in model test is still a tuff work especially the stiffness of the mooring system. Owing to the above mentioned problem, the model test results are not accurate enough for air gap evaluation. The aim of this paper is to present sensitivity analysis results of air gap motion with respect to the mooring system and wind load for the design of semi-submersible platform. Though the model test results are not suitable for the direct evaluation of air gap, they can be used as a good basis for tuning the radiation damping and viscous drag in numerical simulation. In the presented design example, a numerical model is tuned and validated by ANSYS AQWA based on the model test results with a simple 4 line symmetrical horizontal soft mooring system. According to the tuned numerical model, sensitivity analysis studies of air gap motion with respect to the mooring system and wind load are performed in time domain. Three mooring systems and five simulation cases about the presented platform are simulated based on the results of wind tunnel tests and sea-keeping tests. The sensitivity analysis results are valuable for the floating platform design.  相似文献   

20.
在Hamilton型拟变分原理体系下,建立了一种时间子域以三次和五次B样条函数插值的时间子域法,并将这种新方法用于单锚腿系泊系统的动力响应分析中。算例表明,新方法比传统的动力计算方法Wilson-θ法,在计算精度上有明显的优势,表明本方法能够用于计算单锚腿系泊系统的动力响应。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号