首页 | 官方网站   微博 | 高级检索  
相似文献
 共查询到9条相似文献,搜索用时 0 毫秒
1.
This paper considers a two-stage assembly scheduling problem of N products with setup times to minimize the makespan. In this problem, there is a machining machine which produces components in the first stage. When the required components are available, a single assembly machine can assemble these components into products in the second stage. A setup time is needed whenever the machining machine starts processing components, or the item of component is switched on the machine. The problem is formulated as a mixed integer programming model, and several properties for finding optimal solutions are developed. Moreover, an efficient heuristic based on these optimal properties is proposed. A lower bound is derived to evaluate the performance of the proposed heuristic. Computational results show that the proposed heuristic can obtain a near optimal solution in almost zero time and the average percentage deviation is only 0.478.  相似文献   

2.
In this paper, a novel distributed two stage assembly flowshop scheduling problem (DTSAFSP) is addressed. The objective is to assign jobs to several factories and schedule the jobs in each factory with the minimum total completion time (TCT). In view of the NP-hardness of the DTSAFSP, we develop heuristics method to deal with the problem and propose three hybrid meta-heuristics (HVNS, HGA-RVNS, and HDDE-RVNS). The parameters of HGA-RVNS and HDDE-RVNS are tuned by using the Taguchi method and that of HVNS is done by using the single factor ANOVA method. Computational experiments have been conducted to compare the performances of the proposed algorithms. The analyses of computational results show that, for the instances with small numbers of jobs, HDDE-RVNS obtains better performances than HGA-RVNS and HVNS; whereas for the instances with large numbers of jobs, HGA-RVNS is the best one in all the proposed algorithms. Computational results indicate that the performances of the HDDE-RVNS and HGA-RVNS are not much affected by the number of machines at the first stage and factories. The experimental results also show that the RVNS-based local search steps in both HGA-RVNS and HDDE-RVNS are efficient and effective.  相似文献   

3.
We address the two-stage assembly scheduling problem where there are m machines at the first stage and an assembly machine at the second stage. The objective is to schedule the available n jobs so that total completion time of all n jobs is minimized. Setup times are treated as separate from processing times. This problem is NP-hard, and therefore we present a dominance relation and propose three heuristics. The heuristics are evaluated based on randomly generated data. One of the proposed heuristics is known to be the best heuristic for the case of zero setup times while another heuristic is known to perform well for such problems. A new version of the latter heuristic, which utilizes the dominance relation, is proposed and shown to perform much better than the other two heuristics.  相似文献   

4.
We consider a two-machine re-entrant flowshop scheduling problem in which all jobs must be processed twice on each machine and there are sequence-dependent setup times on the second machine. For the problem with the objective of minimizing total tardiness, we develop dominance properties and a lower bound by extending those for a two-machine re-entrant flowshop problem (without sequence-dependent setup times) as well as heuristic algorithms, and present a branch and bound algorithm in which these dominance properties, lower bound, and heuristics are used. For evaluation of the performance of the branch and bound algorithm and heuristics, computational experiments are performed on randomly generated instances, and results are reported.  相似文献   

5.
Cloud manufacturing, a service oriented, customer centric, demand driven manufacturing model is explored in both its possible future and current states. A unique strategic vision for the field is documented, and the current state of technology is presented from both industry and academic viewpoints. Key commercial implementations are presented, along with the state of research in fields critical to enablement of cloud manufacturing, including but not limited to automation, industrial control systems, service composition, flexibility, business models, and proposed implementation models and architectures. Comparison of the strategic vision and current state leads to suggestions for future work, including research in the areas of high speed, long distance industrial control systems, flexibility enablement, business models, cloud computing applications in manufacturing, and prominent implementation architectures.  相似文献   

6.
7.
Thomas Schael 《AI & Society》1998,12(1-2):38-47
Computer Integrated Manufacturing (CIM) is faced with issues which are crucial to Computer Supported Cooperative Work (CSCW). However, despite the large amount of work on Enterprise Integration and its obvious links to the CSCW field, this domain is almost totally absent in the work of the CSCW community. Therefore, this paper is intended to contribute to the discussion on the relevance of CSCW in manufacturing and to combine new concepts for cooperative work with requirements for information system design in production. Production related models, e.g., an order-driven mode of coordination, can be augmented with mechanisms of interaction for coordination, collaboration and co-decision and the design of customer/supplier chains. It is suggested, as one example, to use workflow management technology in advanced manufacturing for shop-floor production planning and control (PPC). The proposed enterprise model and support technology is especially useful for small-batch production.  相似文献   

8.
A novel distributed model predictive control scheme based on dynamic integrated system optimization and parameter estimation (DISOPE) was proposed for nonlinear cascade systems under net work environment.Under the distributed control structure ,online optimization of the cascade system was composed of several cascaded agents that can cooperate and exchange information via network communication.By iterating on modified distributed lin ear optimal control problems on the basis of est imating parameters at every iteration the correct op timal control action of the nonlinear model predicti ve control problem of the cascade system could b e obtained,assuming that the algorithm was convergen t.This approach avoids solving the complex nonlinear optimi zation problem and significantly reduces the computation al burden.The simulation results of the fossil f uel power unit are illustrated to verify the eff ectiveness and practicability of the proposed algorithm.  相似文献   

9.
A novel distributed model predictive control scheme based on dynamic integrated system optimization and parameter estimation (DISOPE) was proposed for nonlinear cascade systems under network environment. Under the distributed control structure, online optimization of the cascade system was composed of several cascaded agents that can cooperate and exchange information via network communication. By iterating on modified distributed linear optimal control problems on the basis of estimating parameters at every iteration the correct optimal control action of the nonlinear model predictive control problem of the cascade system could be obtained, assuming that the algorithm was convergent. This approach avoids solving the complex nonlinear optimization problem and significantly reduces the computational burden. The simulation results of the fossil fuel power unit are illustrated to verify the effectiveness and practicability of the proposed algorithm.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号