首页 | 官方网站   微博 | 高级检索  
     

基于 MC 方法的模拟工程量清单综合单价 合理性评价研究
引用本文:李国良,廖恒枭,王磊,李玉龙. 基于 MC 方法的模拟工程量清单综合单价 合理性评价研究[J]. 工程管理学报, 2020, 34(1): 137-142. DOI: 10.13991/j.cnki.jem.2020.01.025
作者姓名:李国良  廖恒枭  王磊  李玉龙
作者单位:1,2,3. 昆明理工大学 建筑工程学院;2. 中国石化销售有限公司 云南石油分公司;4. 中央财经大学 管理科学与工程学院
摘    要:针对模拟工程量清单广泛应用的背景及综合单价合理性的重要作用,对模拟工程量清单项目的工作流程进行梳理, 认为模拟工程量清单项目模式实质上属于快速路径施工管理模式。根据综合单价的组价原理和方法,结合蒙特卡洛(MC) 方法构建了综合单价合理性评价模型。并结合实际案例验证了基于 MC 方法的综合单价评价模型方便实用,模拟结果具有 一定的科学性,为模拟工程量清单项目招评标管理提供了新方法。

关 键 词:模拟工程量清单  蒙特卡洛方法  综合单价  合理性评价

Study on the Effectiveness Evaluation of Comprehensive Unit Price of Simulated Bill of Quantities Based on MC Method
LI Guo-liang,LIAO Heng-xiao,WANG Lei,LI Yu-long. Study on the Effectiveness Evaluation of Comprehensive Unit Price of Simulated Bill of Quantities Based on MC Method[J]. Journal of Engineering Management, 2020, 34(1): 137-142. DOI: 10.13991/j.cnki.jem.2020.01.025
Authors:LI Guo-liang  LIAO Heng-xiao  WANG Lei  LI Yu-long
Affiliation:1,2,3. Architectural Engineering Institute,Kunming University of Technology;2. Yunnan Petroleum Branch of Sinopec Sales Co. Ltd.;4. School of Management Science and Engineering,Central University of Finance and Economics
Abstract:Considering the background of the wide application of simulated bill of quantity (BOQ) and the important role played by the effectiveness of comprehensive unit price,this paper combs the workflow of simulated BOQ projects and argues that the project mode of simulated BOQ is essentially a construction management mode with fast path method. Then,by employing Monte Carlo (MC) method,it builds an evaluation model for assessing the effectiveness of comprehensive unit price according to the principles and methods of the comprehensive unit price. Finally,by using real cases,this study confirms that the comprehensive unit price evaluation model based on MC method is convenient and practical and the simulated result has certain scientific nature,which provides a new approach for the bidding evaluation management of simulated BOQ projects.
Keywords:simulated bill of quantity   Monte Carlo method   comprehensive unit price   effectiveness evaluation
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《工程管理学报》浏览原始摘要信息
点击此处可从《工程管理学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号