首页 | 官方网站   微博 | 高级检索  
     

多种采动影响区杆塔地基稳定性数值分析
引用本文:刘朝安, 高文龙, 阙金声. 2011: 多种采动影响区杆塔地基稳定性数值分析. 工程地质学报, 19(6): 922-927.
作者姓名:刘朝安  高文龙  阙金声
作者单位:1.中国电力工程顾问集团华北电力设计院工程有限公司 北京 100120
摘    要:煤炭开采中多种采动影响区包括老采空区、现采空区和未来采空区(规划区)等几种类型。本文对晋东南至南阳段1000kV特高压输电线路途经山西煤田采空区和规划区,评价规划区煤层开采对已建输电杆塔地基稳定性的影响,根据现场收集的资料,利用FLAC3D 数值方法对特高压线路N177输电杆塔下部3号煤层进行开采模拟,并在3号煤层已经开采条件下,进行9号煤层复采的数值模拟。结果表明, 9号煤层复采将对输电杆塔地基稳定性造成影响,地表最大沉降为1.15m,输电杆塔基础沿线最大倾斜为5.7,开采过程中如杆塔基础不采取抗变形措施,杆塔基础倾斜将会危及到特高压输电线路的稳定。

关 键 词:煤层开采  输电杆塔  地基稳定性  数值模拟
收稿时间:2011-05-30
修稿时间:2011-11-15

NUMERICAL ANALYSIS OF TRANSMISSION TOWER FOUNDATION STABILITY AT VARIOUS ZONES AFFECTED BY COAL SEAM MINING
LIU Chao'an, GAO Wenlong, QUE Jinsheng. 2011: NUMERICAL ANALYSIS OF TRANSMISSION TOWER FOUNDATION STABILITY AT VARIOUS ZONES AFFECTED BY COAL SEAM MINING. JOURNAL OF ENGINEERING GEOLOGY, 19(6): 922-927.
Authors:LIU Chao'an  GAO Wenlong  QUE Jinsheng
Affiliation:1.North China Power Engineering Co.,LTD of China Power Engineering Consulting Group,Beijing 100120
Abstract:Coal mining has caused a variety of mining-affected zones including old mined-area,present mined-area and future mined-area.The 1000 kV UHV transmission line of Southeast Shanxi to Nanyang passes through the mined out space and layout area of Shanxi coalfield.This paper appraises the influence of mining of coalfield layout area to the foundation stability of the transmission towers.Based on the locally collected data,it used the FLAC3D numerical method.The mining simulation of the coal seam 3# under the N177 tower of the 1000 kV UHV transmission line is presented.After the coal seam 3# has been conducted,the numerical simulation of coal seam 9# is established.The results are as follows: The mining of the coal seam 9# can bring influence on the stability of the transmission tower foundation.The most subsidence of the ground is 1.15m and the most inclination of the transmission tower foundation along the power line is 5.7.Without taking anti-deformation measures,the inclination of the tower foundation will endanger the stability of 1 000 kV UHV transmission line.
Keywords:Coal seam mining  Transmission tower  Stability of foundation  Numerical simulation
点击此处可从《工程地质学报》浏览原始摘要信息
点击此处可从《工程地质学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号