首页 | 官方网站   微博 | 高级检索  
     

桩锚结构变形协调方法的改进研究
引用本文:晏鄂川,刘焕斌,李相依,吴益平.桩锚结构变形协调方法的改进研究[J].岩土力学,2009,30(5):1446-1450.
作者姓名:晏鄂川  刘焕斌  李相依  吴益平
作者单位:1. 中国地质大学(武汉)工程学院,武汉,430074
2. 中国地质大学(武汉)工程学院,武汉,430074;中国建筑西南勘察设计研究院有限公司,成都,610081
摘    要:桩锚结构变形协调条件是桩锚结构设计中内力计算的关键点。现行桩锚结构变形协调条件是在锚索施加预应力后桩身向坡内变形十分微小而忽略不计的条件下推导得到的,只适用于锚索预应力微小或为0的情况。但在许多工程实例中,锚索的预应力较大,导致的桩身变形不能被忽略。因此,现行的变形协调条件假设与桩锚结构的实际工作状态不一致。利用结构力学理论,在研究桩锚结构体系的两阶段变形过程的基础上,对变形协调方程从2个方面改进,其一是改变原有方法中抗滑桩滑面处位移和转角的计算方法;其二是改变第j排锚索对桩身 点处位移贡献的计算形式。算例分析表明,改进桩锚结构变形协调条件,可以更好地为工程设计服务。

关 键 词:桩锚结构  变形协调条件  锚索预应力  变形阶段
收稿时间:2007-09-11

Improvement of compatible distortion method for structure of pile-anchor
YAN E-chuan,LIU Huan-bin,LI Xiang-yi,WU Yi-ping.Improvement of compatible distortion method for structure of pile-anchor[J].Rock and Soil Mechanics,2009,30(5):1446-1450.
Authors:YAN E-chuan  LIU Huan-bin  LI Xiang-yi  WU Yi-ping
Affiliation:1. Faculty of Engineering, China University of Geosciences, Wuhan 430074, China; 2. China Southwest Geotechnical Investigation and Surveying Institute, Chengdu 610081, China
Abstract:Compatible distortion method of structure of pile-anchor is a key point in internal force computing of structure of pile-anchor. The present method is derived from a hypothesis that the distortion of the pile is very small, or even can be ignored. Thus the method can be used only when the prestressed force of cable is very small or null. But in a lot of engineering case, the prestressed force of cable is significant and the distortion of pile can’t be ignored. So, the hypothesis of present method is not in accordance with the working condition of the structure of pile-anchor. Based on studying on the two steps of distortion process, the present method is improved with structural mechanics theory in two aspects. Firstly, the calculating method of the distortion and rotation in the slipping surface is modified. Secondly, the formula which is used to count the distortion made by the anchor on the j row to the i point on the pile is improved. An example is given to prove that the improved method is more useful to the engineering design.
Keywords:structure of pile-anchor  compatible distortion condition  prestressed force of cable  step of distortion
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号