首页 | 官方网站   微博 | 高级检索  
     

垃圾填埋场中水平导排盲沟渗流模型及间距设计
引用本文:叶剑,兰吉武,陈云敏,柯瀚,王克虹.垃圾填埋场中水平导排盲沟渗流模型及间距设计[J].岩土工程学报,2016,38(10):1923-1929.
作者姓名:叶剑  兰吉武  陈云敏  柯瀚  王克虹
作者单位:1. 浙江大学软弱土与环境土工教育部重点实验室,浙江 杭州 310058;;2. 深圳市下坪固体废弃物填埋场,广东 深圳 518000
基金项目:国家重点基础研究发展计划(“973”计划)项目(2012CB19800); 国家自然科学基金青年科学基金项目(41502276); 深圳市城管局科研课题(201319,201502)
摘    要:水平导排盲沟是垃圾填埋场一种重要的堆体内渗沥液导排设施,其水平间距对导排能力和水位控制效果有直接影响。通过建立水平导排盲沟渗流模型,得到了盲沟上水位浸润线的解析解,提出了对应于稳定控制警戒水位要求的水平导排盲沟间距设计方法,并与数值计算结果进行比较。进一步揭示了入流量、垃圾饱和渗透系数、盲沟尺寸、盲沟等效渗透系数和盲沟水平间距对盲沟水位控制能力的影响规律,研究结果表明:当盲沟等效渗透系数小于10~(-4)cm/s时,堆体最大水头及盲沟上水头均明显上升;控制入流量与垃圾饱和渗透系数比值小于0.05时,有利于实现堆体水位控制。基于上述分析,提出了无量纲化的盲沟水平间距设计用图。最后,通过算例分析,验证了文章提出的水平导排盲沟间距设计方法。

关 键 词:填埋场  水平导排盲沟  渗流模型  水位浸润线  间距设计  
收稿时间:2014-08-13

Seepage model and spacing design of horizontal trench in landfills
YE Jian,LAN Ji-wu,CHEN Yun-min,KE Han,WANG Ke-hong.Seepage model and spacing design of horizontal trench in landfills[J].Chinese Journal of Geotechnical Engineering,2016,38(10):1923-1929.
Authors:YE Jian  LAN Ji-wu  CHEN Yun-min  KE Han  WANG Ke-hong
Affiliation:1. Ministry of Education Key Laboratory of Soft Soils and Geoenvironmental Engineering, Zhejiang University, Hangzhou 310058, China;2. Xiaping Solid Waste Landfill Site, Shenzhen 518000, China
Abstract:The horizontal trench is a major leachate drainage facility in municipal solid waste (MSW) landfills, of which the spacing design affects drainage and water level greatly. Based on a new seepage model for horizontal trench, the analytical solution of saturation line and the relationship between design spacing of horizontal trench and warning water level can be deduced. The results of numerical calculation agree well with the analytical solutions. It is further revealed that how the inflow, saturated hydraulic conductivity of MSW, size and spacing and equivalent hydraulic conductivity of the horizontal trench influence the capacity of water level control. The results show that the maximum head of waste body and the head at horizontal trench significantly increase when the hydraulic conductivity of horizontal trench drops below 1×10-4cm/s; and it is in favor of the control of water level when the ratio of the inflow to the saturated hydraulic conductivity of MSW is less than 5×10-2. A dimensionless figure of spacing design of horizontal trench is proposed, and is verified by a typical case analysis.
Keywords:landfill  horizontal trench  seepage model  saturation line  spacing design  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土工程学报》浏览原始摘要信息
点击此处可从《岩土工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号