湖南省某水电站空调工程方案比较
引用本文:颜永民,彭建国,张国强.湖南省某水电站空调工程方案比较[J].建筑热能通风空调,2007,26(1):55-59.
作者姓名:颜永民  彭建国  张国强
作者单位:湖南大学土木工程学院
摘    要:本工程地处湖南省益阳市,包括48栋住宅和1栋办公楼。在对建筑冷负荷特点进行分析的基础上,给出了3种夏季空调方案,分别以螺杆式制冷机组、风冷热泵和直燃式溴化锂冷水机组作为空调系统的冷源。通过对方案的初投资和运行费用等进行分析,得出螺杆式制冷机组适合作为本工程的冷源。

关 键 词:控制策略  初投资  运行费用  寿命周期费用
文章编号:1003-0344(2007)01-055-5
修稿时间:2006-01-08

Comparison of Cooling Schemes of a Hydraulic Power Plant in Hunan Province
Yan Yongmin,Peng Jianguo,Zhang Guoqiang.Comparison of Cooling Schemes of a Hydraulic Power Plant in Hunan Province[J].Building Energy & Environment,2007,26(1):55-59.
Authors:Yan Yongmin  Peng Jianguo  Zhang Guoqiang
Affiliation:School of Civil Engineering, Hunan University
Abstract:The base is located in Yiyang city, Hunan province, including 48 residential buildings and a 19-story office building. Based on the analysis of the profile of building cooling loads, three cooling schemes are put forward, in which screw chillers, air-source heat pump and direct-fired LiBr absorption chillers are adopted as cooling sources for the air-conditioning system, respectively. Compared from initial investment and operating cost, etc, screw chillers are proved more economical than others, and are adopted as cooling sources for this project.
Keywords:control strategies  initial investment  operating cost  life cycle cost