首页 | 官方网站   微博 | 高级检索  
     

江阴长江大桥B标工程施工总结
引用本文:董荧.江阴长江大桥B标工程施工总结[J].土木建筑与环境工程,2001,23(5):85-90129.
作者姓名:董荧
作者单位:中港集团第二航务工程局二公司 重庆400042
摘    要:详细介绍了中国第一跨度的江阴长江大桥B标施工中采用的先进施工工艺和管理措施,如索塔施工三维坐标法测量,人工小药量挖孔桩,下塔柱翻横施工,大体积混凝土浇注温度控制,塔柱斜爬模施工等,可供大型桥梁施工时参考。

关 键 词:索塔基础  塔柱  横梁  连续箱梁  施工管理

Construction Technology for Bid Construction Part B of Yangtze River Bridge in Jiangyin City
DONG Ying.Construction Technology for Bid Construction Part B of Yangtze River Bridge in Jiangyin City[J].土木建筑与环境工程,2001,23(5):85-90129.
Authors:DONG Ying
Abstract:In this paper, the advanced construction technology and site management applied in bid construction part B of Yangtze River bridge in Jiangyin was presented in detail. This bridge is the largest span bridge in China, where the advanced technology applied is: 3-d coordinate control surveying in bridge tower, small powder for artificial pile, over-form and climb form in construction of tower column, temperature control for casting mass concrete. It is of great value for reference to large bridge building.
Keywords:foundation of bridge tower  tower column  beam  continuous box beam  construction technology  site management
点击此处可从《土木建筑与环境工程》浏览原始摘要信息
点击此处可从《土木建筑与环境工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号