丹东站无站台柱雨棚吊装施工控制
引用本文:王运诗.丹东站无站台柱雨棚吊装施工控制[J].山西建筑,2009,35(12):127-128.
作者姓名:王运诗
作者单位:中铁四局,安徽,合肥,230023
摘    要:结合具体工程实例,从桁架柱吊装、主钢架吊装、次桁架梁、纵向桁架、檩条及附件吊装等方面介绍了无站台柱雨棚吊装施工控制,指出该施工工艺圆满地解决了吊装安全问题,保证了安装精度和焊接质量,很好地完成了施工生产任务。

关 键 词:无站台柱雨棚  吊装  施工控制

Hoisting construction control of the no-station pole canopy on Dandong station
WANG Yun-shi.Hoisting construction control of the no-station pole canopy on Dandong station[J].Shanxi Architecture,2009,35(12):127-128.
Authors:WANG Yun-shi
Affiliation:WANG Yun-shi
Abstract:Combining with concrete project,the author introduces the hoisting construction of the no-station pole canopy from aspects of the truss leg hoisting,hoisting of main steel frame,secondary truss beam,vertical truss,purling and hoisting of the accessories,points out that this construction technology solves the hoisting safety problem perfectly,ensures the installation precision and welding quality,and completes construction production task well.
Keywords:no-station pole canopy  hoisting  construction control  