首页 | 官方网站   微博 | 高级检索  
     

建筑工程全过程跟踪审计的问题分析
引用本文:楼丽英.建筑工程全过程跟踪审计的问题分析[J].城市建筑,2014(2):158-158.
作者姓名:楼丽英
作者单位:中汇工程咨询有限公司
摘    要:我国建设领域目前对工程造价的理解分为两种:一是建设项目全费用全过程的动态管理,二是阶段全过程动态管理。本文根据某项目工程建筑项目的跟踪审计实例,从建筑工程的各个阶段入手,着重分析跟踪审计怎样才能做到全过程把控。

关 键 词:建筑工程  施工  审计  阶段

Analysis of the Whole Process Tracking Audit of Construction Project
Lou Liying.Analysis of the Whole Process Tracking Audit of Construction Project[J].Urbanism and Architecture,2014(2):158-158.
Authors:Lou Liying
Abstract:The understanding of the project cost in construct-ion field of our country at present is divided into two kinds:one is the dynamic management of construction project total cost in entire process, and the other is a dynamic management process. According to the engineering project construction pr-oject tracking audit case, this paper starting from the various stages of construction engineering, focuses on the analysis of tracking audit how to do the whole process control.
Keywords:building engineering  construction  auditing  stage
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号