建筑工程中异型地下连续墙施工技术探讨 |
| |
引用本文: | 杨宏章.建筑工程中异型地下连续墙施工技术探讨[J].重庆建筑,2008(2):10-12. |
| |
作者姓名: | 杨宏章 |
| |
作者单位: | 湖南益阳工程公司,湖南益阳,413000 |
| |
摘 要: | 本文根据异型地下连续墙施工技术的特点,并结合工程实例,对施工准备、测量、挖槽、钢筋笼吊装、混凝土浇筑到成墙各个施工步骤进行了详细阐述,对施工中的质量控制措施和应急处理措施作了扼要介绍。
|
关 键 词: | 异型连续墙 泥浆护壁 挖槽 混凝土浇筑 |
文章编号: | 1671-9107(2008)02-0010-03 |
收稿时间: | 2008-01-02 |
修稿时间: | 2008年1月2日 |
Discussion on the Construction Technology of Special-shaped Underground Continuous Wall in Construction Project |
| |
Authors: | Yang Hong-Zhang |
| |
Affiliation: | Yang Hong-zhang |
| |
Abstract: | According to the characteristic of the construction technology of special-shaped underground continuous wall,this article elaborated each step from construction preparation,survey,dredging,erection of reinforcement cage,concrete casting to wall forming,further briefly introduced the quality control measures and emergency treatment methods. |
| |
Keywords: | special-shaped underground continuous wall mud protection dredging concrete casting |