Challenges and opportunities for productivity improvement studies in linear,repetitive, and location-based scheduling
Authors:Gunnar Lucko  Thaís Da CL Alves  Vanessa Lira Angelim
Affiliation:1. Department of Civil Engineering, Catholic University of America, Washington, DC, USA.lucko@cua.edu;3. Department of Civil, Construction and Environmental Engineering, San Diego State University, San Diego, USA.;4. Integral Engenharia, Fortaleza, Brazil.
Abstract:Despite theoretical advancements in alternative project planning methods the extent of their practical implementation varies strongly; it has been limited especially in the US construction industry. The family of linear, repetitive, and location-based scheduling techniques holds significant but barely substantiated promise by containing multiple variables of interest for integrated analysis and optimization. Yet it is necessary to provide empirical evidence that using such techniques can improve productivity to increase credibility and acceptance by practitioners, because claims of conceptual superiority are only sporadically supported with detailed measures. An analysis is performed to identify relevant decision-making variables, extract challenges that currently limit the corpus of quantitative productivity studies on alternative scheduling to its insufficient size, and reveal opportunities to expand it in breadth and depth. Variables are categorized by their relevance to time, activity, resource and location, as well as the managerial approach. Challenges include the diverse definitions of productivity itself, issues related to achieving generalizability, and the detailed steps of data collection, preparation, and analysis. Opportunities include the guidance from existing but rare studies and well-established research methods such as case studies that can be applied. This is illustrated with a sample project of a high-rise apartment building in Brazil. If alternative methods can be proven to be measurably better for specific applications, there might be a paradigm shift from merely defaulting to traditional but problematic network-based scheduling toward consciously choosing the planning method based on its potential benefits for a project.
Keywords:Case studies  project management  project planning  scheduling  workflow
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号