箱形横梁的水压爆破拆除
作者单位:;1.安徽理工大学;2.江西工业工程职业技术学院;3.安徽理工大学 安徽淮南232001;4.江西萍乡337055
摘    要:某电影院大厅内钢筋混凝土箱形横梁长25m,断面尺寸1 6m×2 4m,用水压爆破拆除。通过梁的受力分析得知,为避免横梁的挠度过大,在吊梁拆除后必须另补支撑,以确保水压爆破正常进行。文中对水压爆破炸药用量的计算公式进行了比较和简评。在参考计算结果和考虑厅内环境的基础上,并结合以往水压爆破工程的经验,确定了合理、有效的药量,保证了主体结构的绝对安全。

关 键 词:箱形横梁  钢筋混凝土结构  水压爆破  受力分析

THEORETICAL CALCULATION OF NOTCHED HEIGHT ABOUT TOWER BUILDING DEMOLISHED BY BLASTING
Abstract:It is a common knowledge that the notched height of tall reinforced concrete building demolished by blasting is 1.5~2.0 times of the wall thickness of building,which meets the requirements of stand-off and directional collapse.But in the case of a tower building,since there is a supporting steel bar at the blasting cut,the height deducted from the common knowledge is hard to ensure directional collapse.For this reason,the present paper,according to the strength rigidness requirements and stable limit of bearing capacity of compression bar,the notched height of reinforced concrete tower building can be calculated.The produced results agree with the ones used in the discussed blasting engineering,and therefore,are valuable to the similar engineering.
Keywords:Tower building  Blasting demolition  Notched height  Theoretical calculation
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号