首页 | 官方网站   微博 | 高级检索  
     

海铁联运港口混合作业模式下轨道吊与集卡协同调度
引用本文:李舒仪,韩晓龙.海铁联运港口混合作业模式下轨道吊与集卡协同调度[J].计算机应用,2021,41(5):1506-1513.
作者姓名:李舒仪  韩晓龙
作者单位:上海海事大学 物流科学与工程研究院, 上海 201306
基金项目:上海市科学技术委员会创新项目(16DZ1201402,16040501500)。
摘    要:在集装箱海铁联运港口中,铁路作业区作为连接铁路运输和水路运输的重要节点,其装卸效率将影响集装箱海铁联运的整体效率。首先,对比分析了“船舶-列车”作业模式和“船舶-堆场-列车”作业模式的特点,并结合海铁联运港口实际作业情况提出了混合作业模式。然后,以轨道吊完工时间最短为目标构建混合整数规划模型,既考虑了班列和船舶的作业时间窗约束,又考虑了轨道吊间干扰和安全距离、轨道吊和集卡接续作业和等待时间等现实约束。针对遗传算法在局部搜索能力方面的不足,将启发式规则与遗传算法相结合设计了求解轨道吊与集卡协同调度问题的混合遗传算法(HGA),并进行了数值实验。实验结果验证了所提模型和混合算法的有效性。最后通过设计实验分析集装箱数量、岸边箱占比、轨道吊数量和集卡数量对轨道吊完工时间和集卡完工时间的影响,发现同等集装箱数量下岸边箱占比提高时,应通过增加轨道吊数量来有效缩短完工时间。

关 键 词:海铁联运  混合作业模式  协同调度  混合遗传算法  作业时间窗  
收稿时间:2020-07-23
修稿时间:2020-09-15

Collaborative scheduling of rail-mounted gantry crane and container truck in hybrid operation mode of rail-water intermodal terminal
LI Shuyi,HAN Xiaolong.Collaborative scheduling of rail-mounted gantry crane and container truck in hybrid operation mode of rail-water intermodal terminal[J].journal of Computer Applications,2021,41(5):1506-1513.
Authors:LI Shuyi  HAN Xiaolong
Affiliation:Institute of Logistics Science and Engineering, Shanghai Maritime University, Shanghai 201306, China
Abstract:In the container rail-water terminal, the railway operation area is the essential node linking rail transportation and water transportation and its efficiency can influence the efficiency of container rail-water transportation. Firstly, the features of the "ships, trains" operation mode and the "ships, yard, trains" operation mode were analyzed and compared, and a hybrid operation mode was proposed by combining the actual operation of container rail-water intermodal terminal. Next, with the goal of minimizing the completion time of rail-mounted gantry crane, a mixed integer programming model was developed. The model considered the allowable operating time window constraints of trains and ships, and the realistic constraints such as the interference and safety margin between the rail-mounted gantry cranes as well as the continuous operation and waiting time of rail-mounted gantry crane and container truck. Aiming at the insufficient local search ability of genetic algorithm, a Hybrid Genetic Algorithm (HGA) was proposed by combining the heuristic rules with genetic algorithm to solve the collaborative scheduling problem of rail-mounted gantry crane and container truck, and experiments were conducted. Experimental results verified the effectiveness of the proposed model and the hybrid algorithm. Finally, some experiments were designed to analyze the impact of the number of containers, the proportion of quayside containers, the number of rail-mounted gantry cranes and the number of container trucks on the completion time of rail-mounted gantry crane and container truck. It is found that under the same number of containers, the number of rail-mounted gantry crane should be increased with the increase of proportion of quayside containers to reduce the completion time.
Keywords:rail-water intermodal transportation  hybrid operation mode  collaborative scheduling  Hybrid Genetic Algorithm (HGA)  allowable operating time window  
本文献已被 万方数据 等数据库收录!
点击此处可从《计算机应用》浏览原始摘要信息
点击此处可从《计算机应用》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号