首页 | 官方网站   微博 | 高级检索  
     


Study on Power Tower Extraction and Fast Positioning from Airborne LiDAR Data
Authors:Guo Tao  Shen Ping  Shi Lei
Affiliation:(1.Guizhou Power Grid Corp Transmission Operation and Maintenance Branch,Guiyang 550002,China;; 2.Institute of Remote Sensing and Digital Earth,Chinese Academy of Sciences,Beijing 100094,China;; 3.Guizhou Electric Power Design Institute,Guiyang 550002,China)
Abstract:Airborne LiDAR has become an important technique for transmission line digitalization,reconstruction and safety inspection.Moreover,accurately and efficiently extracting the position of each tower from massive point clouds is basic and important task for the applications in power industry.In this study,a method was proposed to efficiently extract the point clouds and fast determine the position of power towers using airborne LiDAR data.Firstly,the point clouds of power towers were automatically separated from raw data based on the spatial distribution characteristics of airborne LiDAR data.Secondly,each power tower was efficiently detected using a region\|growing algorithm.Finally,a least square linear fitting method was used to determine the accurate position of each power tower.The new proposed method was applied to several LiDAR data sets in areas with high voltage transmission lines.Results indicated that the integrity of the power towers’ points is up to 91.1%,and the accuracy of center positions is high enough with the medium error of 13.5 cm.Additionally,our study also concluded that the proposed method is robust and applicable even the point density is relatively low.
Keywords:Airborne LiDAR  Power tower  Power line  Region-growing  Least squares fitting  
点击此处可从《遥感技术与应用》浏览原始摘要信息
点击此处可从《遥感技术与应用》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号