首页 | 官方网站   微博 | 高级检索  
     


Iterated greedy algorithms for the blocking flowshop scheduling problem with makespan criterion
Affiliation:1. Industrial Management, School of Engineering, University of Seville, Ave. Descubrimientos s/n, Seville E41092, Spain;2. Grupo de Sistemas de Optimización Aplicada, Instituto Tecnológico de Informática, Ciudad Politécnica de la Innovación, Edifico 8G, Acc. B. Universitat Politècnica de València, Camino de Vera s/n, 46021 València, Spain;1. Izmir Democracy University, Department of Industrial Engineering, Izmir 35140, Turkey;2. Qatar University, Industrial and Mechanical Engineering Department, Doha, Qatar;3. Shanghai University, School of Mechatronic Engineering and Automation, Shanghai 200072, P. R. China;4. Ohio University, Russ College of Engineering and Technology, Department of Industrial and Systems Engineering, Athens, OH 45701, USA
Abstract:Recently, iterated greedy algorithms have been successfully applied to solve a variety of combinatorial optimization problems. This paper presents iterated greedy algorithms for solving the blocking flowshop scheduling problem (BFSP) with the makespan criterion. Main contributions of this paper can be summed up as follows. We propose a constructive heuristic to generate an initial solution. The constructive heuristic generates better results than those currently in the literature. We employ and adopt well-known speed-up methods from the literature for both insertion and swap neighborhood structures. In addition, an iteration jumping probability is proposed to change the neighborhood structure from insertion neighborhood to swap neighborhood. Generally speaking, the insertion neighborhood is much more effective than the swap neighborhood for the permutation flowshop scheduling problems. Instead of considering the use of these neighborhood structures in a framework of the variable neighborhood search algorithm, two powerful local search algorithms are designed in such a way that the search process is guided by an iteration jumping probability determining which neighborhood structure will be employed. By doing so, it is shown that some additional enhancements can be achieved by employing the swap neighborhood structure with a speed-up method without jeopardizing the effectiveness of the insertion neighborhood. We also show that the performance of the iterated greedy algorithm significantly depends on the speed-up method employed. The parameters of the proposed iterated greedy algorithms are tuned through a design of experiments on randomly generated benchmark instances. Extensive computational results on Taillard’s well-known benchmark suite show that the iterated greedy algorithms with speed-up methods are equivalent or superior to the best performing algorithms from the literature. Ultimately, 85 out of 120 problem instances are further improved with substantial margins.
Keywords:Meta-heuristics  Blocking flowshop  Iterated greedy algorithm  Variable neighborhood search  Constructive heuristics
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号