首页 | 官方网站   微博 | 高级检索  
     


Multiobjective constructive heuristics for the 1/3 variant of the time and space assembly line balancing problem: ACO and random greedy search
Authors:Manuel Chica  Óscar Cordón
Affiliation:a European Centre for Soft Computing, Mieres, Spain
b Universitat Politècnica de Catalunya, Barcelona, Spain
c Nissan Chair, Barcelona, Spain
Abstract:In this work we present two new multiobjective proposals based on ant colony optimisation and random greedy search algorithms to solve a more realistic extension of a classical industrial problem: time and space assembly line balancing. Some variants of these algorithms have been compared in order to find out the impact of different design configurations and the use of heuristic information. Good performance is shown after applying every algorithm to 10 well-known problem instances in comparison to NSGA-II. In addition, those algorithms which have provided the best results have been employed to tackle a real-world problem at the Nissan plant, located in Spain.
Keywords:Time and space assembly line balancing problem  Ant colony optimisation  GRASP  Multiobjective optimisation  NSGA-II  Automotive industry
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号