摘    要:Based on a lot of measurement and analysis,this paper find that the unbalanced nature of 35 kV grids due to unsymmetrical capacitance values gives difficulty in neutral point operation in mountainous area.Improving compensation of Petersen coil can rectify imbalance of voltage but bring up new problem that Petersen coil can not extinguish grounding arc effectively in fault.To put down contradiction mentioned above,this paper proposes a combination operation for neutral point of 35 kV grids as neutral point insulated in routine operation and grounding through Petersen coil in fault,then EMTP simulation is carried out.Simulation indicates that new neutral operation method can improve lightning withstand level and decrease trip-out rate of grids.

关 键 词:mountainous  area  35kV  grids  unsymmetrical  capacitance  values  neutral  point  operation  method

Combination Operation for Neutral Point of 35 kV Power Grids in Mountainous Area
YUAN Tao,SIMA Wen-xia,RAN Rui.Combination Operation for Neutral Point of 35 kV Power Grids in Mountainous Area[J].High Voltage Engineering,2008,34(12):2626-2630.
Authors:YUAN Tao  SIMA Wen-xia  RAN Rui
Affiliation:1,ZHU Wei2(1.State Key Laboratory of Power Transmission Equipment & System Security and New Technology,Chongqing University,Chongqing 400044,China;2.Linan Electric Power Bureau,Linan 311307,China)
Abstract:Based on a lot of measurement and analysis, this paper find that the unbalanced nature of 35 kV grids due to unsymmetrical capacitance values gives difficulty in neutral point operation in mountainous area. Improving compensation of Petersen coil can rectify imbalance of voltage but bring up new problem that Petersen coil can not extinguish grounding arc effectively in fault. To put down contradiction mentioned above, this paper proposes a combination operation for neutral point of 35 kV grids as neutral point insulated in routine operation and grounding through Petersen coil in fault, then EMTP simulation is carried out. Simulation indicates that new neutral operation method can improve lightning withstand level and decrease trip-out rate of grids.
Keywords:mountainous area  35kV grids  unsymmetrical capacitance values  neutral point operation method