兼顾元件权重和发电机同调性的山东电网PMU布点方法
引用本文:许洪强,雷 鸣,张元鹏,史东宇,林俊杰,谢小荣,吴京涛.兼顾元件权重和发电机同调性的山东电网PMU布点方法[J].电网技术,2008,32(15):21-26.
作者姓名:许洪强  雷 鸣  张元鹏  史东宇  林俊杰  谢小荣  吴京涛
作者单位:山东电力调度中心,清华大学电机系,北京四方继保自动化股份有限公司
摘    要:在稳定计算的基础上,对于相量测量单元(phasor measurement unit,PMU)最优配置问题,进行了可观性权重设置和机组同调性分析。首先把逐点法与穷举法结合到一起形成了一种新的静态可观性改进算法,并引入了元件权重的概念来区分对不同设备可观性要求的程度;然后考虑了发电机同调性的影响,以可观性布点为基础,形成了动态可观性的布点;最后根据山东电网2006年夏季大方式的稳定计算结果,结合可观性和发电机同调性,提出了一种分阶段实施的有效PMU布点方法。

关 键 词:相量测量单元(PMU)  最优PMU布点(OPP)  可观性  机组同调性  元件权重  电力系统
收稿时间:2007-07-24

An Improved PMU Placement Method Considering Weights of Components and Coherency of Generators for Shandong Power Grid
XU Hong-qiang,LEI Ming,ZHANG Yuan-peng,SHI Dong-yu,LIN Jun-jie,XIE Xiao-rong,WU Jing-tao.An Improved PMU Placement Method Considering Weights of Components and Coherency of Generators for Shandong Power Grid[J].Power System Technology,2008,32(15):21-26.
Authors:XU Hong-qiang  LEI Ming  ZHANG Yuan-peng  SHI Dong-yu  LIN Jun-jie  XIE Xiao-rong  WU Jing-tao
Affiliation:1.Shandong Electric Power Dispatching Center,Jinan 250001,Shandong Province,China;
2.Department of Electrical Engineering,Tsinghua University,Haidian District,Beijing 100084,China; 3.Beijing Sifang Automation Co. Ltd.,Haidian District,Beijing 100085,China
Abstract:Based on the calculation of stability, both observable weighting assignment of components and coherency analysis of units for optimal placement of phasor measurement units (PMUs) are conducted. Firstly, the point-by-poing method is integrated with exhaustion method to form a new refinement algorithm for static observability, and a concept of component weight is proposed to distinguish the requirement of observability for diffenret equipments; then, considering the coherency of units and based on ovservable placement, a dynamic and observable PMU placement is obtained; finally, according to the stablilty calculation results of heavy load operation mode of Shandong power grid in the summer of 2006, and combining with observabilty and unit coherency, an effective PMU placement scheme implemented in stages is put forward.
Keywords:phasor measurement unit (PMU)  optimal PMU placement (OPP)  observability  unit coherency  component weight  power system