基于灰关联矢量投影法的黑启动方案优选
引用本文:李芝荣,唐林权,李如琦,徐露,蔡婷,童满成,周智成.基于灰关联矢量投影法的黑启动方案优选[J].南方电网技术,2014,8(4):72-76.
作者姓名:李芝荣  唐林权  李如琦  徐露  蔡婷  童满成  周智成
作者单位:广西电网公司 玉林供电局,广西 玉林537000;国网新疆电力公司乌鲁木齐供电公司,乌鲁木齐830011;广西大学 电气工程学院,南宁530004;广西大学 电气工程学院,南宁530004;广西大学 电气工程学院,南宁530004;广西大学 电气工程学院,南宁530004;广西大学 电气工程学院,南宁530004
摘    要:制定科学合理的黑启动方案对于实现电力系统大面积停电后的快速恢复具有重要的现实意义。提出了基于灰关联矢量投影法的黑启动方案评估模型,通过层次分析法确定指标的主观权重,采用熵权法确定指标的客观权重,基于加法原理融合主客观权重信息得到各指标的综合权重值。结合灰色系统理论和矢量投影原理,计算评价对象的优属度,实现黑启动方案优选。实际电网的应用实例证明了该方法可以为黑启动恢复提供科学合理的决策参考。

关 键 词:电力系统  黑启动  层次分析法  熵权法  灰关联投影  优属度

Grey Relation Vector Projection Method Based Black-Start Scheme Optimization
LI Zhirong,TANG Linquan,LI Ruqi,XU Lu,CAI Ting,TONG Mancheng and ZHOU Zhicheng.Grey Relation Vector Projection Method Based Black-Start Scheme Optimization[J].Southern Power System Technology,2014,8(4):72-76.
Authors:LI Zhirong  TANG Linquan  LI Ruqi  XU Lu  CAI Ting  TONG Mancheng and ZHOU Zhicheng
Affiliation:Yulin Power Supply Bureau, Guangxi Power Grid Corp, Yulin, Guangxi 537000, China;Urumqi Power Company,State Grid Xinjiang Electric Power Company, Urumqi 830011, China;School of Electrical Engineering, Guangxi University, Nanning 530004, China;School of Electrical Engineering, Guangxi University, Nanning 530004, China;School of Electrical Engineering, Guangxi University, Nanning 530004, China;School of Electrical Engineering, Guangxi University, Nanning 530004, China;School of Electrical Engineering, Guangxi University, Nanning 530004, China
Abstract:Scientific and rational black-start plans are important to the fast restoration of the power system after large-area blackouts. A new scheme evaluation model for black-start based on grey relation projection method is proposed. The subjective weights are determined by the analytic hierarchy process and the objective weights are determined by entropy method,then the comprehensive weights of the objects' indices can be obtained based on the addition principle. Combining with grey system theory and the vector projection principle,the priority membership of the evaluation objects is calculated,then the optimization of black-start scheme is achieved. Actual application to the power system proved that the proposed method could provide dispatchers with scientific and rational decisionmaking references.
Keywords:power system  black start  analytic hierarchy process  entropy method  grey relation projection  priority membership