汾河二库导流洞封堵设计
引用本文:吴存虎,孛永平.汾河二库导流洞封堵设计[J].山西电力,2002(Z2).
作者姓名:吴存虎  孛永平
作者单位:水利部山西水利水电勘测设计研究院,山西 太原 030024
摘    要:导流洞为临时泄水建筑物 ,若不与永久建筑物结合 ,在蓄水时都要进行封堵。封堵方法一般先在进口进行截流堵漏 ,然后按永久建筑物要求修建成堵头或改建成其它泄水建筑物。汾河二库导流洞不与永久建筑物结合 ,封堵时不需要全孔封死 ,浇筑一定长度的混凝土堵头 ,就足以起永久挡水作用

关 键 词:导流洞  封堵设计

Block up Design of Diversion Hole in Fenhe No.2 Reservoir Dam
WU Cun hu,BO Yong ping.Block up Design of Diversion Hole in Fenhe No.2 Reservoir Dam[J].Shanxi Electric Power,2002(Z2).
Authors:WU Cun hu  BO Yong ping
Abstract:Diversion hole is a temperary water discharge building.It need to be block up while storing water if it is not combined with perminent building.The mothed is to cut flood by block up an inlet,build interceptor of change to other water discharge building according to perminent dam is not combined with perminent building,so it need not to be sealed completely.when blocking up.pouring certain length of concrete interceptor.It can block up flood perminently.
Keywords:diversion hole  block up design