首页 | 官方网站   微博 | 高级检索  
     

基于改进BP网络的高炉煤气发生量预测模型
引用本文:肖冬峰,杨春节,宋执环.基于改进BP网络的高炉煤气发生量预测模型[J].浙江大学学报(自然科学版 ),2012,46(11):2103-2108.
作者姓名:肖冬峰  杨春节  宋执环
作者单位:浙江大学 工业控制技术国家重点实验室,浙江 杭州 310027
基金项目:国家“863”高技术研究发展计划资助项目(2006AA04Z184)
摘    要:针对高炉煤气发生量波动对煤气调度和优化影响的问题,提出一种基于改进BP网络的高炉煤气发生量预测模型.由于影响高炉煤气发生量的因素很多,采用机理和现场实际数据相结合方法分析影响高炉煤气发生量的因素,确定模型输入,采用炼铁高炉现场数据对模型进行训练,利用贝叶斯正则化算法来提高神经网络泛化能力.仿真结果表明,该模型能够准确预测高炉煤气发生量的变化趋势,为制定煤气管网平衡调度策略提供科学的依据和决策支持,有利于减少煤气排放,提高煤气利用率和企业的信息化水平.该预测模型已经成功应用到杭州钢铁集团煤气调度系统中,运行结果验证模型的有效性.

关 键 词:高炉煤气发生量  BP网络  预测模型  贝叶斯正则化  泛化能力

The forecasting model of blast furnace gas output based on improved BP network
XIAO Dong-feng,YANG Chun-jie,SONG Zhi-huan.The forecasting model of blast furnace gas output based on improved BP network[J].Journal of Zhejiang University(Engineering Science),2012,46(11):2103-2108.
Authors:XIAO Dong-feng  YANG Chun-jie  SONG Zhi-huan
Affiliation:(State Key Laboratory of Industrial Control Technology,Zhejiang University,Hangzhou 310027,China)
Abstract:To the problem of fluctuations in the amount of blast furnace gas which affects the gas scheduling and gas balance,the improved back propagation (BP) network was used to build the forecasting model of blast furnace gas output. Since there were a lot of factors affecting the output of blast furnace gas, the input of the model was determined through understanding the operation mechanism of blast furnace gas and the correlation analysis of practical production data. Practical production data of blast furnace was also used to train the model. The Bayesian regularization method was used for improving the generalization ability of artificial neural network. Simulation shows that this model has high accuracy in forecasting the trends of the output of blast furnace gas, to provide the scientific basis and decision support for the gas resources balance and scheduling. As a result, it is useful to reduce the leaking gas and improve the utilization ratio of gas and the information based degree of the whole enterprise as well. This forecasting model has been successfully applied in the gas scheduling system of Hangzhou Iron & Steel Group Company (HISGC) of China and the running results demonstrate the validity of the proposed method.
Keywords:
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《浙江大学学报(自然科学版 )》浏览原始摘要信息
点击此处可从《浙江大学学报(自然科学版 )》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号