首页 | 官方网站   微博 | 高级检索  
     

某电厂烟气脱硫机组GGH改造的分析与探讨
引用本文:刘科勤,万艳雷.某电厂烟气脱硫机组GGH改造的分析与探讨[J].广州化工,2010,38(10):178-180.
作者姓名:刘科勤  万艳雷
作者单位:1. 中钢集团天澄环保科技股份有限公司,湖北,武汉,430205
2. 长江勘测规划设计研究院,湖北,武汉,430010
摘    要:主要对某电厂石灰石—石膏法烟气脱硫机组GGH的改造进行了介绍,并通过对造成GGH堵塞的原因进行分析与探讨,提出了一系列解决方案和措施,并探讨采用湿烟囱防腐取代GGH的可能。

关 键 词:烟气脱硫  石灰石—石膏  GGH改造  湿烟囱防腐

Discussion of Rebuilding GGH in Power Plant Flue Gas Desulfurization
LIU Ke-qin,WAN Yan-lei.Discussion of Rebuilding GGH in Power Plant Flue Gas Desulfurization[J].GuangZhou Chemical Industry and Technology,2010,38(10):178-180.
Authors:LIU Ke-qin  WAN Yan-lei
Affiliation:1 Sinosteel Tiancheng Environmental Protection Science & Technology Co.,Ltd.,Hubei Wuhan 430205;2 Chang Jiang Institute of Survey Planning Design and Research,Hubei Wuhan 430010,China)
Abstract:The characters of rebuilding GGH in a power plant flue gas desulfurization were introduced.On the basis of the analysis of the soot and scale formation,some proper treatment was suggested to solve the problem.The possibility of FGD chimney anticorrosion rebuilding without GGH was discussed.
Keywords:flue gas desulfurization  limestone-gypsum  GGH rebuilding  wet chimney anticorrosion
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号