Dai Kun The 8th Bureau of Water Conservancy and Hydraulic Power Engineering Of China,Changsha,Hunan 410119
Abstract:
The paper introduces the structure and assembly characteristics of VGS generating sets for Three Gorges
Left Powerhouse. The axis alignment process, calculation methods and the influence of working procedure revision on
the time lime for the project are stated briefly.