摘    要:简要介绍三峡左岸电站VGS机组结构特点,总装特点,盘车及轴线调整的程序、计算方法,程序修改情况及对工期的影响等。

关 键 词:三峡左岸电站  VGS水轮发电机组  轴线  盘车  总装

Axis alignment and assembly of VGS water turbine generator sets for Three Gorges Left Powerhouse
Authors:Dai Kun The th Bureau of Water Conservancy and Hydraulic Power Engineering Of China  Changsha  Hunan
Affiliation:Dai Kun The 8th Bureau of Water Conservancy and Hydraulic Power Engineering Of China,Changsha,Hunan 410119
Abstract:The paper introduces the structure and assembly characteristics of VGS generating sets for Three Gorges Left Powerhouse. The axis alignment process, calculation methods and the influence of working procedure revision on the time lime for the project are stated briefly.
Keywords:Three Gorges Left Powerhouse  VGS generating set  assembly  axis alignment  calculation method
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号