某大型水利枢纽汛期分期方案研究
引用本文:赵璧奎,黄本胜,邱静,谭超,罗舒燕.某大型水利枢纽汛期分期方案研究[J].广东水利水电,2016(9):6-10, 28.
作者姓名:赵璧奎  黄本胜  邱静  谭超  罗舒燕
作者单位:广东省水利水电科学研究院,广东省水动力学应用研究重点实验室,河口水利技术国家地方联合工程实验室,广东 广州 510610
基金项目:广东省水利科技创新项目(2011-06、2012-02、2014-06)
摘    要:汛期分期方案研究是开展水库汛期水位动态控制技术研究的重要基础。综合采用成因分析方法和数理统计方法,分析了某大型水利枢纽库区暴雨、洪水发生规律,提出了把汛期划分为前汛期、主汛期和后汛期三个阶段的汛期分期方案。研究成果为该水利枢纽及同一流域内相关水利工程开展雨洪资源化利用研究提供基本依据。

关 键 词:大型水利枢纽  汛期分期  成因分析  数理统计
收稿时间:2016/7/15 0:00:00
修稿时间:2016/7/15 0:00:00

Study on a Hydraulic Project Flood Season Staging Program
ZHAO Bikui,HUANG Bensheng,QIU Jing,TAN Chao and LUO Shuyan.Study on a Hydraulic Project Flood Season Staging Program[J].Guangdong Water Resources and Hydropower,2016(9):6-10, 28.
Authors:ZHAO Bikui  HUANG Bensheng  QIU Jing  TAN Chao and LUO Shuyan
Affiliation:Guangdong Research Institute of Water Resources and Hydropower, Guangdong Key Laboratory of Hydrodynamic Research, National and Local Joint Engineering Laboratory of Estuarine water technology, Guangzhou 510635, China,Guangdong Research Institute of Water Resources and Hydropower, Guangdong Key Laboratory of Hydrodynamic Research, National and Local Joint Engineering Laboratory of Estuarine water technology, Guangzhou 510635, China,Guangdong Research Institute of Water Resources and Hydropower, Guangdong Key Laboratory of Hydrodynamic Research, National and Local Joint Engineering Laboratory of Estuarine water technology, Guangzhou 510635, China,Guangdong Research Institute of Water Resources and Hydropower, Guangdong Key Laboratory of Hydrodynamic Research, National and Local Joint Engineering Laboratory of Estuarine water technology, Guangzhou 510635, China and Guangdong Research Institute of Water Resources and Hydropower, Guangdong Key Laboratory of Hydrodynamic Research, National and Local Joint Engineering Laboratory of Estuarine water technology, Guangzhou 510635, China
Abstract:The study of flood stage constitutes an important basis for the research of reservoir water level dynamic control in flood season. By using of both cause analysis method and mathematical statistics, the paper made an analysis to the occurrence law of rainstorms and floods in reservoir area of a large hydro project, and proposed a flood staging method of dividing flood season into such three stages as pre-flood season, major flood season and post-flood season. The research results can provide a fundamental basis on utilization of rainwater resources for both the hydro project and related project in the same river basin.
Keywords:Large Hydro Project  Flood Stage  Cause Analysis  Mathematical Statistics