首页 | 官方网站   微博 | 高级检索  
     

步进式加热炉汽化冷却系统热水泵改进
引用本文:杜勇刚,邓红兵,刘白雁.步进式加热炉汽化冷却系统热水泵改进[J].冶金丛刊,2007(4):28-29.
作者姓名:杜勇刚  邓红兵  刘白雁
作者单位:1. 武汉钢铁集团公司
2. 武汉科技大学机械自动化学院
摘    要:分析了武钢轧板厂2^#加热炉汽化冷却系统热水泵运行中存在故障的原因。针对这些故障,提出了两种改进措施,一种是设计新型机构,采取新的密封方式;另一种是将选泵程序的逻辑扩大化。

关 键 词:步进加热炉  热水泵  机械密封
文章编号:1671-3818(2007)04-0028-02

IMPROVEMENT OF THE HOT WATER PUMP FOR EVAPORATION COOLING SYSTEM IN WALKING BEAM FURNACE
Du Yonggang,Deng Hongbing,Liu Baiyan.IMPROVEMENT OF THE HOT WATER PUMP FOR EVAPORATION COOLING SYSTEM IN WALKING BEAM FURNACE[J].Metallurgical Collections,2007(4):28-29.
Authors:Du Yonggang  Deng Hongbing  Liu Baiyan
Abstract:The paper analyzed the equipment fault of the hot water pump of the evaporation cooling system in the 2th furnace. Two measures were put forward. One is designing new mechanical structure and taking new sealing mode. The other is enlarging the logical program of choosing pumps. In this way the fault was eliminated and the reliability and safety of the devices were greatly increased.
Keywords:walking beam furnace  hot water pump  mechanical seal
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号