首页 | 官方网站   微博 | 高级检索  
     

广州市某综合楼桩基检测和断桩成因分析
引用本文:农观业.广州市某综合楼桩基检测和断桩成因分析[J].勘察科学技术,1998(4):63-65.
作者姓名:农观业
作者单位:中国科学院地球化学研究所!广州市,510640
摘    要:广州市某综合楼桩基采用沉管灌注桩。用反射波法对该柱基进行了质量检测,发现断桩、缩径桩比例较大。文章就该工地桩基质量差的原因进行了主观、客观分析,并提出了减少和避免断桩、缩径桩的建议。

关 键 词:桩基工程  反射波法  断桩  缩径桩

PILE FOUNDATION EXAMINATION AND ANALYSIS OF THE CAUSE OF PILE CUT-OFF AT A SYNTHETIC BUILDING IN GUANGZHOU CITY
Nong Guanye.PILE FOUNDATION EXAMINATION AND ANALYSIS OF THE CAUSE OF PILE CUT-OFF AT A SYNTHETIC BUILDING IN GUANGZHOU CITY[J].Site Investigation Science and Technology,1998(4):63-65.
Authors:Nong Guanye
Abstract:For the pile foundation of the synthetic building at Guangzhou city, the cast-in-place tube sinking piles are adopted. The quality examination has been executed using the reflected wave method. The pile cutoff and tbe shrinking-diameter piles are discovered and numbered in rather large proportion. This paper makes subjective and objective analysis of the cause of the poor quality of the pile foundation. Recommendations to decrease and avoid the pile cut-off and shrinking-diameter piles are presented.
Keywords:pile foundation projects  reflected wave method  pile cut-off  shrinking-diameter pile  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号