首页 | 官方网站   微博 | 高级检索  
     


Finding Forces Required to Change Air Hammer Path in Soil
Authors:B B Danilov  B N Smolyanitsky  A I Chanyshev  D O Cheshchin
Affiliation:1.Chinakal Institute of Mining, Siberian Branch,Russian Academy of Sciences,Novosibirsk,Russia;2.Novosibirsk State University of Economics and Management,Novosibirsk,Russia;3.Siberian State Transport University,Novosibirsk,Russia
Abstract:The authors solve the problem on forces required to change drilling path of air hammers in soil. Soil mass is assumed a rigid–plastic medium with the Mohr–Coulomb yield, and the air hammer deviator is considered as a nondeformable body. The problem is solved in two stages: introduction of the deviator in soil and travel of the air hammer in soil with the rear deviated at a certain angle. The loads applied to the rear, the forces and the moment required to changing the path of an air hammer in soil are calculated.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号