首页 | 官方网站   微博 | 高级检索  
     

高速铁路路基结构时变系统耦合动力分析
引用本文:马学宁,梁波.高速铁路路基结构时变系统耦合动力分析[J].铁道学报,2006,28(5):65-70.
作者姓名:马学宁  梁波
作者单位:1. 兰州交通大学,土木工程学院,甘肃,兰州,730070
2. 重庆交通大学,土木建筑学院,重庆,400074
基金项目:甘肃省自然科学基金;重庆市教委资助项目;重庆市自然科学基金;兰州交通大学校科研和教改项目
摘    要:在车辆的走行过程中,上部与下部是相互作用和影响的,因此,轨道交通问题实际上就是线路上下部结构和车辆系统的体系匹配问题。本文针对列车走行的实际情况,将轨道-路基作为参振子结构纳入车辆计算模型,建立了包含车辆、钢轨、轨枕、道床和路基作为一体的二系垂向耦合动力分析模型。作为模型的验证,结合京秦线提速改造工程进行了列车-路基动力仿真计算,得出在不同行车速度条件下,机车车辆通过路基段加固前后状态下的车体加速度、动轮载、轮重减载率及道床和路基主要动力性能指标,并与实车试验进行对比。试验测试结果验证了理论模型和分析方法的有效性,为高速铁路路基的动力特性分析和设计提供一些参考。

关 键 词:车辆  路基  时变  耦合  动力响应
文章编号:1001-8360(2006)05-0065-06
收稿时间:2006-04-05
修稿时间:2006-06-27

A Time-varying Coupling Model for Dynamic Analysis of High Speed Railway Subgrade
MA Xue-ning,LIANG Bo.A Time-varying Coupling Model for Dynamic Analysis of High Speed Railway Subgrade[J].Journal of the China railway Society,2006,28(5):65-70.
Authors:MA Xue-ning  LIANG Bo
Affiliation:1. School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070, China;2, School of Civil Engineering and Architecture, Chongqing Jiaotong University, Chongqing 400074, China
Abstract:Track transportation can be divided into the track system above and the track system below.While the train is moving,the parts above and below are interacted and mutually influenced.Therefore,the problem of track transportation is actually the matching between the vehicle and the railway line system.In this paper,keeping to the conditions of train running and taking the track-subgrade as a part of the vibration structure of the vehicle mode1,a vehicle-subgrade model of the secondary suspension vertically coupled system including the vehicle,rail,sleeper,ballast and subgrade is established.Dynamic computer simulation of the vehicle-subgrade system is performed in combination with speed raising reconstruction project of the Jingqin Railway Line as the verification of the model.Regarding the train travelling at different speeds and through subgrade sections ahead of and subsequent to strengthening,dynamic responses such as the acceleration of the vehicle,dynamic wheel load and rate of wheel load reduction and the main dynamic characters of ballast and subgrade are calculated and compared with the experimental results.The effectiveness of the theoretical model and simulation analysis are verified by the test results.Reference is made to analysis of the dynamic characters and design of the subgrade of high-speed railways.
Keywords:vehicle  subgrade  time varying  coupling  dynamic response
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号