秦沈客运专线570t箱梁制架设备的转场方案 |
| |
引用本文: | 林原,罗朝基,曾敏.秦沈客运专线570t箱梁制架设备的转场方案[J].铁道标准设计通讯,2002(1):16-19. |
| |
作者姓名: | 林原 罗朝基 曾敏 |
| |
作者单位: | 中铁二局集团有限公司秦沈指挥部,辽宁临海,110200 |
| |
摘 要: | 秦沈客运专线 5 70t箱梁制架设备复杂 ,体积大 ,质量大。安全和高效是转场方案的基本原则和主题 ,围绕以上两点对架桥机、运梁车、提梁机的解体及运输方案进行阐述。
|
关 键 词: | 箱梁制架设备 转场施工 方案 |
修稿时间: | 2001年8月12日 |
Transfer of the 570 t box girder fabricating and erecting equipment for Qinhuangdao-Shenyang Passenger Special Line |
| |
Abstract: | Safety and high efficiency are two basic guidelines for the transfer of 570t box girder fabricating and erecting equipment due to its complex structure, large size and heavy weight. The disassembly and transportation plan for bridge girder erecting equipment, beam transportation car and beam lifting machine is described. |
| |
Keywords: | box girder fabricating and erecting equipment transfer plan |