首页 | 官方网站   微博 | 高级检索  
     

上向分层胶结充填采场顶板稳定性分析
引用本文:崔茂金.上向分层胶结充填采场顶板稳定性分析[J].有色金属(矿山部分),2009,61(6):51-55.
作者姓名:崔茂金
作者单位:云南驰宏锌锗股份有限公司,云南,曲靖,655000
摘    要:云南省会泽铅锌矿8号矿体矿围岩为不稳固岩体,采用上向分层胶结充填采矿法,采场顶板的稳定性是保证矿山安全高效回采的关键。文中采用三维有限元模拟对采场顶板进行了稳定性分析,通过对矿体不同回采步骤顶板位移、应力分布进行分析,确定了矿体合理的回采顺序,有效地控制了顶板稳定问题,提高了回采效率。

关 键 词:上向分层胶结充填  有限元模拟  位移  应力

Stability Analysis of Winning Track's top Tray of upper to Lamination Consolidated Fill
Authors:CUI Maojin
Abstract:Eight number orebody of Huize Lead-Zinc mine is unsteady,system of mining is upper to lamination consolidated fill,and stability of winning track's top tray is the key to mine safety and high efficiency drawning.Stability analysis was adopted to winning track's top tray by means of triaxiality finite element modeling.Displacement and stress distribution of top tray was proceeded on differ drawn step.Finally reasonable drawn order was determined,stable of top tray is effectively controlled,in addition,drawn efficiency is improved.
Keywords:upper to lamination consolidated fill  finite element modeling  displacement  stress
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《有色金属(矿山部分)》浏览原始摘要信息
点击此处可从《有色金属(矿山部分)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号