首页 | 官方网站   微博 | 高级检索  
     

矿建施工总体方案优化研究
引用本文:白越,朱柏石.矿建施工总体方案优化研究[J].辽宁工程技术大学学报(自然科学版),1990(4).
作者姓名:白越  朱柏石
作者单位:阜新矿业学院井巷工程教研室 (白越),阜新矿业学院井巷工程教研室(朱柏石)
摘    要:本文提出了利用决策网络的新方法来确定井巷工程最优施工方案。文中详细叙述了决策网络的绘制方法和主要特点,建立了决策网络的数学模型,为矿建施工总体方案的优化提供了新的理论依据和手段。

关 键 词:决策网络图  决策工程  0—1整数规划  动态规划

RESEARCH OF THE OPTIMUM ARRANGING PLAN FOR THE MINE CONSTRUCTION
Bai Yue Zhu Baishi.RESEARCH OF THE OPTIMUM ARRANGING PLAN FOR THE MINE CONSTRUCTION[J].Journal of Liaoning Technical University (Natural Science Edition),1990(4).
Authors:Bai Yue Zhu Baishi
Affiliation:Bai Yue Zhu Baishi
Abstract:The state and enterPeise can earn the more economic peof it by means of optimizing the population scheme of mine development constrution. To select the optimum plan of mine development, a new method, called the decision network graph, has been put forward in the paper. The drawing means and main characters of the decision network graph are in detail explained in the paper. The mathematical model of the decision network graph is set up, supplying the new theoretical basis and means for optimizing the mine development construction plan.
Keywords:decision network graph  decision engineering  0-1 integeral programming  dynamic programming  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司    京ICP备09084417号-23

京公网安备 11010802026262号